Filter interviews by
I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.
Top trending discussions
I was interviewed in Dec 2024.
I applied via Job Portal and was interviewed in Sep 2024. There were 2 interview rounds.
Fixtures and jigs are tools used in manufacturing to hold and guide workpieces during machining or assembly processes.
Fixtures are devices used to securely hold workpieces in place during machining operations
Jigs are tools that guide cutting tools or other machinery during operations
Fixtures and jigs help ensure accuracy, repeatability, and efficiency in manufacturing processes
Examples include drill jigs for guiding dr...
Preventive maintenance is the practice of regularly inspecting, cleaning, and servicing equipment to prevent breakdowns and prolong its lifespan.
Regularly scheduled inspections and maintenance tasks are performed to identify and address potential issues before they become major problems.
Examples include changing air filters in HVAC systems, lubricating moving parts in machinery, and checking for leaks in plumbing syste...
Computer aided design (CAD) is the use of computer software to create, modify, analyze, and optimize designs for various industries.
CAD allows engineers and designers to create 2D or 3D models of products or structures.
It helps in visualizing and simulating designs before they are physically built.
CAD software can be used in industries such as automotive, aerospace, architecture, and manufacturing.
Examples of CAD softw
Computer aided manufacturing (CAM) is the use of software to control machine tools and related machinery in the manufacturing of workpieces.
CAM software generates toolpaths and instructions for machines to follow during the manufacturing process.
CAM systems can be used for various processes such as milling, turning, and laser cutting.
CAM helps in automating and optimizing the manufacturing process, leading to increased...
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
Manpower in shift can be handled by proper planning, communication, training, and monitoring.
Create a shift schedule that ensures adequate coverage and proper distribution of workload.
Communicate clearly with employees about their shift timings, responsibilities, and expectations.
Provide training to employees on their roles and responsibilities during the shift.
Monitor the performance and productivity of employees duri...
8D analysis is a problem-solving method used to identify, correct, and prevent recurring problems.
Define the problem
Form a team
Containment actions
Root cause analysis
Corrective actions
Implement permanent corrective actions
Prevent recurrence
Recognize team efforts
The 7QC tools are a set of quality control tools used for problem-solving and process improvement.
Identify the problem or process to be improved
Collect data related to the problem
Display data visually using tools like histograms or scatter plots
Analyze the data to identify root causes of the problem
Brainstorm and implement solutions
Monitor the results of the implemented solutions
Standardize the process to prevent recur
Warranty parts should be properly documented, tracked, and analyzed to identify trends and improve product quality.
Create a system to track warranty parts including serial numbers, dates, and reasons for return
Analyze warranty parts data to identify common issues and trends
Work with suppliers to address recurring issues and improve product quality
Implement corrective actions based on warranty parts analysis to prevent
Any one past experience for quality issue
posted on 27 Dec 2024
I applied via Job Portal and was interviewed in Jun 2024. There was 1 interview round.
The combustion chamber is where fuel and air are mixed and burned in an internal combustion engine.
It is a part of an internal combustion engine where the fuel-air mixture is ignited and burned.
The combustion chamber is designed to contain and control the combustion process.
It is typically located within the cylinder head of an engine.
The shape and design of the combustion chamber can affect engine performance and effi
Refrigerant system is a closed loop system that absorbs heat from a low-temperature area and releases it in a high-temperature area.
Refrigerant circulates through the system to absorb and release heat
Compressor increases the pressure of the refrigerant gas
Condenser cools the refrigerant gas into a liquid
Expansion valve reduces the pressure of the liquid refrigerant
Evaporator absorbs heat from the surrounding area to co...
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
Easy and pretty good
The project involved designing and implementing a new production process to improve efficiency and reduce costs.
Identify areas for improvement in current production process
Research and analyze different production methods and technologies
Design and implement new production process
Test and optimize the new process for efficiency and cost-effectiveness
Overcoming is the act of successfully dealing with or overcoming a challenge, obstacle, or difficulty.
Identifying the challenge or obstacle
Developing a plan or strategy to address it
Taking action to implement the plan
Persisting through setbacks or failures
Learning from the experience to improve future outcomes
Standard online aptitude tests with some written questions
Group assessment day, lasted 4 hours, group tasks followed by one-on-one
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Diploma Trainee Engineer
520
salaries
| ₹1.1 L/yr - ₹2.6 L/yr |
Junior Engineer
230
salaries
| ₹1.8 L/yr - ₹5.3 L/yr |
DET
196
salaries
| ₹1.4 L/yr - ₹2.5 L/yr |
Engineer
178
salaries
| ₹3.2 L/yr - ₹7.5 L/yr |
Assistant Manager
176
salaries
| ₹4.8 L/yr - ₹15 L/yr |
Bosch
Mahindra & Mahindra
Tata Motors
Maruti Suzuki