Upload Button Icon Add office photos

Filter interviews by

Excel Realty N Infra Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How would you sell me this pen?
  • Ans. 

    I would highlight the pen's sleek design, smooth writing experience, and durability.

    • Start by showcasing the pen's elegant design and comfortable grip.

    • Highlight the smooth ink flow and precision of the pen for a superior writing experience.

    • Emphasize the durability of the pen, ensuring it will last a long time and provide value for money.

  • Answered by AI
  • Q2. How will sell this pen with higher price than market price?
  • Ans. 

    By highlighting the unique features and benefits of the pen, creating a sense of exclusivity and luxury, and offering personalized customization options.

    • Highlight the premium quality materials used in the pen

    • Emphasize the unique design and craftsmanship

    • Create a sense of exclusivity and luxury associated with owning the pen

    • Offer personalized customization options such as engraving or special packaging

    • Provide excellent c

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work on your communication skills.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via campus placement at SRM Institute of Science & Technology, Chennai and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. TYPES OF STARTERS
  • Ans. 

    Starters are devices used to start and control the speed of induction motors.

    • Direct On-Line (DOL) starter: provides full voltage to the motor at start

    • Star-Delta starter: reduces the starting current by initially connecting the motor in star configuration

    • Auto-transformer starter: uses an auto-transformer to reduce the voltage during starting

    • Soft starter: gradually increases the voltage to the motor to reduce starting cu...

  • Answered by AI
  • Q2. Types and methods of earthing
  • Ans. 

    Earthing is the process of connecting electrical systems to the ground to prevent electric shock and protect equipment.

    • Types of earthing include plate earthing, pipe earthing, rod earthing, and strip earthing.

    • Methods of earthing include neutral earthing, equipment earthing, and system earthing.

    • Earthing is essential for safety in electrical systems to prevent electric shock and damage to equipment.

    • Proper earthing ensure...

  • Answered by AI
  • Q3. Principle and types of TF
  • Ans. 

    TF stands for Transformer. It is a static device used to transfer electrical energy between two or more circuits through electromagnetic induction.

    • Principle of TF involves Faraday's law of electromagnetic induction.

    • Types of TF include step-up, step-down, isolation, auto-transformer, etc.

    • TFs are used in power distribution, voltage regulation, impedance matching, etc.

  • Answered by AI
  • Q4. Starting current of dol starter
  • Ans. 

    The starting current of a DOL starter is typically 6-8 times the rated current of the motor.

    • The Direct-On-Line (DOL) starter is used to start induction motors.

    • The starting current of a DOL starter is usually 6-8 times the rated current of the motor.

    • This high starting current can cause voltage drops and stress on the electrical system.

  • Answered by AI
  • Q5. How to choose the Ac cables
  • Ans. 

    Choose AC cables based on current rating, insulation material, and environmental conditions.

    • Consider the current rating of the cable to ensure it can handle the load

    • Choose the appropriate insulation material based on the application and environment

    • Take into account environmental conditions such as temperature, moisture, and exposure to chemicals

    • Select the right cable size to minimize voltage drop and power loss

    • Ensure c...

  • Answered by AI
  • Q6. Basic electric questions like ohms law formula

Interview Preparation Tips

Interview preparation tips for other job seekers - BE PREPARED , Asking aboug basic electrical questions
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What are the OSHA standards applicable to building construction?
  • Ans. 

    OSHA standards applicable to building construction include fall protection, hazard communication, scaffolding safety, and electrical safety.

    • Fall protection requirements include guardrails, safety nets, and personal fall arrest systems.

    • Hazard communication standards require employers to provide information about hazardous chemicals used on site.

    • Scaffolding safety regulations cover proper construction, use, and maintenan...

  • Answered by AI
  • Q2. What are the AISC codes applicable to steel structures?
  • Ans. 

    AISC codes applicable to steel structures include AISC 360 for design of structural steel buildings and AISC 341 for seismic design.

    • AISC 360 - Specification for Structural Steel Buildings

    • AISC 341 - Seismic Provisions for Structural Steel Buildings

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Group Discussion 

My previous experiences, roles, and responsibilities, as well as technical discussions.

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Whats LEL tell procedures
  • Q2. Tel us the control of confind
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. What is earthwork
  • Ans. 

    Earthwork refers to the process of moving, excavating, and compacting soil and rock to prepare the ground for construction.

    • Earthwork involves activities such as excavation, grading, compaction, and backfilling.

    • It is essential for creating a stable foundation for roads, buildings, and other structures.

    • Earthwork also includes the removal of unwanted materials and the addition of necessary materials to achieve the desired...

  • Answered by AI
  • Q2. What is GSB wmm
  • Ans. 

    GSB stands for Granular Sub Base and WMM stands for Wet Mix Macadam. GSB WMM is a type of road construction method using layers of granular materials.

    • GSB is the layer of granular material placed on the subgrade of a road to provide a stable foundation.

    • WMM is a mixture of aggregates, filler, and water laid on the GSB layer to form a strong base for the road.

    • GSB WMM construction involves compacting each layer properly to...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil field all the best
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical questions
  • Q2. Experience questions

Interview Preparation Tips

Interview preparation tips for other job seekers - The jab is simple and good work

Excel Realty N Infra Interview FAQs

How to prepare for Excel Realty N Infra interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Excel Realty N Infra. The most common topics and skills that interviewers at Excel Realty N Infra expect are Cold Calling, Corporate Sales, Lead Generation and Sales.

Tell us how to improve this page.

Excel Realty N Infra Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

4.0

Work-Life balance

4.0

Salary & Benefits

3.0

Job Security

4.0

Company culture

4.0

Promotions/Appraisal

4.0

Work Satisfaction

Explore 1 Review and Rating
Executive Accountant
4 salaries
unlock blur

₹4 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Excel Realty N Infra with

ABCI Infrastructures

3.5
Compare

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

Perkins

4.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview