Filter interviews by
Top trending discussions
posted on 31 Oct 2023
posted on 24 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 31 Oct 2023
posted on 27 Feb 2024
I applied via Walk-in and was interviewed in Nov 2022. There was 1 interview round.
posted on 11 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The interview question is about 1.33kv&11kv BOQ, power transformer description, and the role of CT/PT.
BOQ for 1.33kv and 11kv involves preparing a bill of quantities for electrical equipment and materials required for the project.
Power transformer description includes its specifications, such as voltage rating, power rating, winding configuration, cooling system, etc.
CT/PT (Current Transformer/Potential Transformer) ar...
Answering questions related to electrical engineering
To find if a transformer is star or delta connected, check the connection of the primary and secondary windings
APL/BPL/AGL materials refer to Above Poverty Line/Below Poverty Line/Anti-Graffiti materials used in construction
ROW stands for Right of Way, which is the legal right to pass through a property or land
posted on 9 Oct 2020
based on 1 review
Rating in categories
Service Engineer
15
salaries
| ₹2 L/yr - ₹5.1 L/yr |
Software Developer
6
salaries
| ₹4.4 L/yr - ₹7.8 L/yr |
Senior Engineer
6
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Executive Engineer
6
salaries
| ₹4.5 L/yr - ₹6.8 L/yr |
Project Engineer
5
salaries
| ₹2.4 L/yr - ₹3 L/yr |
ABCI Infrastructures
Nesma & Partners
VIKRAN Engineering & Exim
The Louis Berger Group