Filter interviews by
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
Material received is recorded and issued to contractors based on size and intended use.
All material received is logged in a record book or inventory system.
Contractor requests are reviewed to determine the size and type of material needed.
Material is issued to contractors based on their request and intended use.
Proper documentation is maintained for all material received and issued.
Material size and use are important f...
How to client satisfaction?
Top trending discussions
I applied via Naukri.com and was interviewed in Sep 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
Basic maths and logical aptitude
I applied via Recruitment Consultant and was interviewed in Jun 2021. There were 3 interview rounds.
SMART goals are specific, measurable, achievable, relevant, and time-bound.
Specific: Goals should be clear and well-defined.
Measurable: Goals should have a way to track progress and measure success.
Achievable: Goals should be realistic and attainable.
Relevant: Goals should be aligned with overall objectives and relevant to the individual or team.
Time-bound: Goals should have a deadline or timeframe for completion.
Examp...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
General Technical with awareness about domain
I was interviewed in Jun 2024.
Freshers self confidence
After meeting than case study
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
How to effectively address and resolve any problem.
Engage in a group discussion regarding any problem and work collaboratively to find a solution.
based on 2 reviews
Rating in categories
Accountant
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Suzlon Group
Adani Power
Adani Group
NTPC