Upload Button Icon Add office photos

Filter interviews by

Elite Powertech Interview Questions and Answers

Updated 2 May 2024

Elite Powertech Interview Experiences

Popular Designations

4 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Switch yard and Transmission line
  • Ans. 220/132/33kV Switch yard and Transmission line
  • Answered Anonymously
  • Q2. Protection of equipment and Relay
  • Ans. 

    Protection of equipment and relay is crucial for ensuring the safety and functionality of electrical systems.

    • Relays are devices that automatically operate to isolate a faulty section of an electrical system.

    • Proper coordination of relays is essential to ensure that the correct relay operates in case of a fault.

    • Regular maintenance and testing of relays is necessary to ensure they function correctly when needed.

    • Overcurren...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Transformers transmission & Distribution line relay

Operation & Maintenance Engineer Interview Questions asked at other Companies

Q1. Why we do oil test and what are we check in oil test?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Testing of transformer
  • Ans. 

    Testing of transformers involves various electrical and mechanical tests to ensure their performance and safety.

    • Transformers are tested for their electrical parameters such as voltage ratio, impedance, and insulation resistance.

    • Mechanical tests include checking for proper winding alignment, core tightness, and oil leakage.

    • Other tests include temperature rise, short circuit, and impulse tests to assess the transformer's...

  • Answered by AI
  • Q2. Testing of Circuit
  • Ans. 

    Testing of Circuit

    • Testing of a circuit involves verifying its functionality and performance

    • Various types of tests are conducted, such as functional testing, performance testing, and safety testing

    • Testing can be done using specialized equipment like multimeters, oscilloscopes, and signal generators

    • Test results are analyzed to identify any issues or faults in the circuit

    • Examples of circuit testing include checking voltag...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall good

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (11)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. I C T testing. Moter testing. SCADA. DG CHEKING And Maintenance Battery bank

Junior Engineer Interview Questions asked at other Companies

Q1. What is the main role of Junior engineer in Electrical maintenance and How to provide the company facilities ?
View answer (25)

I applied via Company Website and was interviewed in Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Please tell us about you

Interview Preparation Tips

Interview preparation tips for other job seekers - I have shared my basic information and then told them about my experience and the work what I have put it on my resume. Like I am from electrical engineer so I have told that I worked in a pgcil as Apprenticeship and learn the operation and maintenance of 765/400/220 kv substation. In which firstly I learned the basics of substation like the what are the equipment we are using in substation like CT,PT, Transformer,ICT,REACTOR,CB,ISOLATOR,ES ETC. The second question they asked where I left in first question like they asked me about what is CT,PT,T/F,CB, ISOLATOR REACTOR and why we are using these equipment's in particular things. So I have told them one by one after that they asked me deeply about the equipment's and their function and the question are from only what I have written in my resume only.

Operation & Maintenance Engineer Interview Questions asked at other Companies

Q1. Why we do oil test and what are we check in oil test?
View answer (1)

Elite Powertech interview questions for popular designations

 Operation & Maintenance Engineer

 (2)

 Electrical Engineer

 (1)

 Junior Engineer

 (1)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Earthmat calculation
  • Q2. Cable sizing calculation
  • Q3. Insulation Coordination study
  • Q4. Battery and charger calculation
Round 2 - Technical 

(2 Questions)

  • Q1. Short circuit calculations
  • Q2. Insulation coordinate study

Interview Preparation Tips

Interview preparation tips for other job seekers - Job security is less
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What are the key aspects of turbine protection?
  • Q2. Boiler light up?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Difference between voltage and current?
  • Ans. 

    Voltage is the potential difference between two points in a circuit, while current is the flow of electric charge through a conductor.

    • Voltage is measured in volts (V) and represents the potential energy difference between two points in a circuit.

    • Current is measured in amperes (A) and represents the flow of electric charge through a conductor.

    • Voltage is analogous to the pressure in a water pipe, while current is analogo...

  • Answered by AI
  • Q2. Then ask me tell me about yourself that is not mentioned in your resume?
  • Q3. Reasoning type question
  • Q4. I come form ECE background they ask me satellite communication and their types
  • Q5. What is modulation and their types?
  • Ans. 

    Modulation is the process of varying a carrier signal to transmit information. Types include amplitude modulation, frequency modulation, and phase modulation.

    • Modulation is the process of varying a carrier signal to transmit information

    • Types of modulation include amplitude modulation (AM), frequency modulation (FM), and phase modulation (PM)

    • AM varies the amplitude of the carrier signal based on the input signal

    • FM varies...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. Voltage for motors
  • Q2. Used to transfer billore
  • Q3. Prafull billore- early Life, career, journey so far
  • Q4. DC motor - 12to 24volt direct current Low voltage Servo motor -24to96 volt direct current Single phase motor-115to 230 volt 3phase motor- 230to 46o volt

Interview Preparation Tips

Topics to prepare for Operational Energy Group India Machine Technician interview:
  • online advertising
Interview preparation tips for other job seekers - Interview is very important questions is work process area and industry machine working process and safety related questions and interest to interview very excellent knowledge
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Narula Institute of Technology, Kolkata and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How to convert kw to mw
  • Ans. 

    To convert kW to MW, divide the power in kW by 1000.

    • To convert kW to MW, divide the power in kW by 1000.

    • For example, 500 kW is equal to 0.5 MW (500 kW / 1000 = 0.5 MW).

  • Answered by AI
  • Q2. What is unit of power
  • Ans. 

    Unit of power is the rate at which work is done or energy is transferred.

    • Unit of power is measured in watts (W)

    • 1 watt is equal to 1 joule per second

    • Power can also be measured in horsepower (hp) in some contexts

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

Leetcode medium-hard

Round 2 - Technical 

(2 Questions)

  • Q1. Largest subarray sum
  • Ans. 

    Find the largest sum of contiguous subarray within a given array of integers.

    • Iterate through the array and keep track of the current sum and maximum sum seen so far.

    • If the current sum becomes negative, reset it to 0 as it won't contribute to the maximum sum.

    • Return the maximum sum found at the end of the iteration.

  • Answered by AI
  • Q2. Level order traversal tree

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare on leetcode

Skills evaluated in this interview

Elite Powertech Interview FAQs

How many rounds are there in Elite Powertech interview?
Elite Powertech interview process usually has 1-2 rounds. The most common rounds in the Elite Powertech interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Elite Powertech interview?

Some of the top questions asked at the Elite Powertech interview -

  1. Protection of equipment and Re...read more
  2. Testing of transfor...read more
  3. Testing of Circ...read more

Tell us how to improve this page.

People are getting interviews through

based on 4 Elite Powertech interviews
Company Website
WalkIn
Referral
25%
25%
25%
25% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Elite Powertech Reviews and Ratings

based on 98 reviews

3.8/5

Rating in categories

3.5

Skill development

3.5

Work-Life balance

3.6

Salary & Benefits

3.2

Job Security

3.3

Company culture

2.9

Promotions/Appraisal

3.6

Work Satisfaction

Explore 98 Reviews and Ratings
Electrical Engineer
30 salaries
unlock blur

₹1.9 L/yr - ₹5 L/yr

Shift Incharge
21 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Operation & Maintenance Engineer
18 salaries
unlock blur

₹2.5 L/yr - ₹3.8 L/yr

Junior Engineer
15 salaries
unlock blur

₹1.8 L/yr - ₹3.8 L/yr

Shift Engineer
14 salaries
unlock blur

₹2.4 L/yr - ₹5.2 L/yr

Explore more salaries
Compare Elite Powertech with

Su-Kam Power Systems

3.5
Compare

Luminous Power Technologies

4.2
Compare

Exide Industries

3.5
Compare

Microtek International

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview