Approximately 100-150 kg of steel is required for 1 m3 of concrete.
Steel reinforcement is typically used in concrete to provide tensile strength and prevent cracking.
The amount of steel required can vary depending on the type of concrete mix and the structural requirements.
For example, for a standard reinforced concrete mix, around 100-150 kg of steel per cubic meter of concrete may be needed.
Escalate amount can be calculated by determining the percentage increase from the base amount.
Determine the base amount that needs to be escalated
Decide on the percentage increase for escalation
Calculate the escalate amount by multiplying the base amount with the percentage increase
Top trending discussions
posted on 5 Jun 2024
Optimistic costing involves estimating project costs on the lower end of the spectrum.
Identify all potential cost-saving measures and efficiencies in the project plan.
Use historical data and benchmarks to estimate costs on the lower side.
Consider best-case scenarios and optimistic assumptions when estimating costs.
Collaborate with stakeholders to gather insights and input on cost-saving opportunities.
Regularly review a...
posted on 13 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Senior Engineer
26
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Safety Supervisor
20
salaries
| ₹1.6 L/yr - ₹2.2 L/yr |
Assistant Engineer
18
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Junior Engineer
18
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Assistant Manager
13
salaries
| ₹4.4 L/yr - ₹9.1 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd