Filter interviews by
I have delivered 10 projects with cost savings ranging from 5% to 20%.
I have managed 10 projects from start to finish
I have successfully implemented cost-saving measures in each project
Cost savings ranged from 5% to 20%
Examples include negotiating better vendor contracts and optimizing resource allocation
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 5 interview rounds.
based on 2 interviews
Interview experience
Assistant Manager
6
salaries
| ₹6.5 L/yr - ₹9 L/yr |
Site Engineer
5
salaries
| ₹5.5 L/yr - ₹5.6 L/yr |
Deputy General Manager
5
salaries
| ₹15.3 L/yr - ₹30 L/yr |
Project Manager
4
salaries
| ₹7.8 L/yr - ₹20 L/yr |
Deputy Manager
4
salaries
| ₹7.5 L/yr - ₹13 L/yr |
TCS
Accenture
Wipro
Cognizant