Calculate brickwork quantity by measuring the dimensions of the room/floor and accounting for wastage.
Measure the length, width, and height of the room/floor in meters.
Calculate the surface area to be covered by multiplying the length by the height for each wall and adding them together.
Account for openings such as doors and windows by subtracting their surface area from the total.
Determine the number of bricks needed ...
The Mass participation ratio for the first three modes is considered for structural analysis using ETABS to ensure accurate representation of the structure's dynamic behavior.
The Mass participation ratio helps in understanding how much each mode contributes to the overall dynamic response of the structure.
It is important to consider the first three modes as they typically represent the most significant modes of vibrati...
Perform a torsional analysis to determine the behavior of the structure.
Conduct a torsional analysis to understand the torsional behavior of the structure.
Check for any asymmetries or irregularities in the model that may be causing the torsional mode.
Consider modifying the structural design to address the torsional behavior if necessary.
Consult with senior engineers or experts in structural dynamics for guidance.
Verify...
Top trending discussions
Some of the top questions asked at the Edifice Engineering Structural Design Engineer interview -
based on 1 interview
Interview experience
Safety Officer
5
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Site Engineer
4
salaries
| ₹2.4 L/yr - ₹4.2 L/yr |
Civil Engineer
4
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Safety Supervisor
4
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Plant and Machinery Incharge
4
salaries
| ₹9.2 L/yr - ₹12.2 L/yr |
Ahluwalia Contracts India
Simplex Infrastructures
Nagarjuna Construction Company
Punj Lloyd