Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Eaton Corporation Team. If you also belong to the team, you can get access from here

Eaton Corporation Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 1k Reviews

Filter interviews by

Eaton Corporation Technical Lead Interview Questions and Answers

Updated 4 May 2024

Eaton Corporation Technical Lead Interview Experiences

1 interview found

Technical Lead Interview Questions & Answers

user image Pratik Jadhav

posted on 4 May 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Prepare DFSS process for product design
  • Ans. 

    DFSS process for product design involves defining customer requirements, measuring critical parameters, analyzing potential risks, optimizing design, and verifying performance.

    • Define customer requirements clearly

    • Measure critical parameters to ensure they meet specifications

    • Analyze potential risks using tools like FMEA

    • Optimize design using tools like DOE

    • Verify performance through testing and validation

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Give overall process about product design and development
  • Ans. 

    Product design and development involves ideation, research, prototyping, testing, and implementation.

    • Ideation: Brainstorming and generating ideas for the product.

    • Research: Conducting market research, user research, and competitive analysis.

    • Prototyping: Creating prototypes to visualize and test the product.

    • Testing: Gathering feedback, iterating on the design, and conducting usability testing.

    • Implementation: Developing t

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectation

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Brief about current job and M tech work.FACT devices ,hvdc
  • Q2. Qusteiion on STATCOM
  • Q3. Comparison of SVC STATCOM
  • Ans. 

    SVC and STATCOM are both types of flexible AC transmission systems used for voltage control in power systems.

    • SVC (Static Var Compensator) is a shunt device that regulates voltage by controlling reactive power flow.

    • STATCOM (Static Synchronous Compensator) is a shunt device that regulates voltage by controlling reactive power flow using power electronics.

    • SVC is typically used for steady-state voltage control, while STATC...

  • Answered by AI
  • Q4. How pscad ,matlab differ
  • Ans. 

    PSCAD is a specialized software for power system simulation, while MATLAB is a general-purpose programming language and tool for numerical computing.

    • PSCAD is specifically designed for power system simulation and analysis.

    • MATLAB is a versatile programming language and tool used for numerical computing, data analysis, and visualization.

    • PSCAD is focused on simulating power systems, while MATLAB can be used for a wide rang...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The hitachi gives low starting salary so negotiate well before joining .The HR is very rude kind

Skills evaluated in this interview

Eaton Corporation Interview FAQs

How many rounds are there in Eaton Corporation Technical Lead interview?
Eaton Corporation interview process usually has 3 rounds. The most common rounds in the Eaton Corporation interview process are Technical, One-on-one Round and HR.
How to prepare for Eaton Corporation Technical Lead interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Eaton Corporation. The most common topics and skills that interviewers at Eaton Corporation expect are Agile, Oracle, Oracle Apps, Scrum and Application.
What are the top questions asked in Eaton Corporation Technical Lead interview?

Some of the top questions asked at the Eaton Corporation Technical Lead interview -

  1. Give overall process about product design and developm...read more
  2. Prepare DFSS process for product des...read more

Tell us how to improve this page.

Eaton Corporation Technical Lead Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 428 Interviews
Johnson Controls Interview Questions
3.6
 • 256 Interviews
ABB Interview Questions
4.1
 • 228 Interviews
Adani Power Interview Questions
3.9
 • 210 Interviews
Adani Group Interview Questions
3.9
 • 178 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Suzlon Group Interview Questions
4.0
 • 128 Interviews
Torrent Power Interview Questions
3.7
 • 125 Interviews
View all
Eaton Corporation Technical Lead Salary
based on 7 salaries
₹13.2 L/yr - ₹36 L/yr
22% more than the average Technical Lead Salary in India
View more details

Eaton Corporation Technical Lead Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

5.0

Skill development

1.0

Work-life balance

4.0

Salary

4.0

Job security

1.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Associate Analyst
439 salaries
unlock blur

₹3.5 L/yr - ₹11.6 L/yr

Analyst
436 salaries
unlock blur

₹4.6 L/yr - ₹18 L/yr

Engineer
287 salaries
unlock blur

₹8.2 L/yr - ₹20 L/yr

Senior Analyst
267 salaries
unlock blur

₹7.5 L/yr - ₹28.5 L/yr

Senior Engineer
253 salaries
unlock blur

₹11.1 L/yr - ₹29 L/yr

Explore more salaries
Compare Eaton Corporation with

Schneider Electric

4.2
Compare

Siemens

4.1
Compare

ABB

4.1
Compare

Emerson Electric Co.

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview