I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.
Internal plaster is needed to provide a smooth and even surface for painting or wallpapering.
Internal plaster helps to cover up any imperfections in the wall surface
It provides a smooth and even surface for painting or wallpapering
It helps to improve the overall appearance of the room
It can also help to improve the insulation and soundproofing of the room
Different types of plaster can be used depending on the specific ...
The curing period of concrete is the time required for it to reach its maximum strength and durability.
The curing period typically lasts for 28 days.
During this period, the concrete gains strength and hardens.
Proper curing is essential to ensure the desired properties of the concrete, such as durability and resistance to cracking.
Curing methods include moist curing, membrane curing, and curing compounds.
Moist curing in...
I appeared for an interview in Apr 2024.
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.
Online meeting conducted with me.About 4 to 5 people along with HR had a discussion with me.Asked questions regarding my work exposure and technical questions.
posted on 9 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 19 Mar 2025
I applied via Naukri.com and was interviewed in Apr 2022. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 3 interview rounds.
A planner focuses on creating a plan or strategy, while a scheduler focuses on creating a timeline or schedule for executing the plan.
A planner is responsible for developing a comprehensive plan that outlines the goals, objectives, tasks, and resources required for a project.
A scheduler takes the plan created by the planner and breaks it down into specific tasks, assigns resources, and creates a timeline or schedule fo...
The critical path is the longest sequence of dependent tasks that determines the project's overall duration.
It identifies the tasks that must be completed on time to prevent delays in the project.
It helps in scheduling and resource allocation.
Tasks on the critical path have zero slack or float.
Any delay in a task on the critical path will delay the project's completion.
It is determined by analyzing the dependencies and...
Total float is the amount of time a task can be delayed without affecting the project end date, while free float is the amount of time a task can be delayed without affecting the early start date of its successor task.
Total float is calculated by subtracting the early start date of a task from its late start date.
Free float is calculated by subtracting the early start date of a task from the early start date of its suc...
posted on 13 Dec 2023
posted on 8 Feb 2024
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
based on 2 interviews
Interview experience
based on 5 reviews
Rating in categories
Site Engineer
7
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Project Engineer
4
salaries
| ₹4 L/yr - ₹4.4 L/yr |
Civil Site Engineer
4
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Project Manager
3
salaries
| ₹7 L/yr - ₹13.5 L/yr |
Mechanical Supervisor
3
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures