Filter interviews by
I applied via AmbitionBox and was interviewed in Mar 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
SG top layer finishing work refers to the final layer of asphalt or concrete pavement on a road or highway.
SG top layer finishing work is the final layer of pavement on a road or highway
It is typically made of asphalt or concrete
The purpose of this layer is to provide a smooth and durable driving surface
It also helps to protect the underlying layers from damage and wear
Examples of SG top layer finishing work include ch
WMM top layer finishing work is the final layer of construction in a road pavement.
WMM stands for Wet Mix Macadam, which is a type of road construction material.
The top layer of WMM is usually made up of crushed aggregates and is laid to a thickness of 50-75mm.
The top layer is compacted using a vibratory roller to achieve the desired density and smoothness.
The finishing work involves trimming the edges of the road, rem...
Dilip Buildcon interview questions for designations
Top trending discussions
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 4 May 2019
posted on 10 Sep 2015
I applied via PLACEMENT
based on 2 interviews
Interview experience
based on 38 reviews
Rating in categories
Senior Engineer
210
salaries
| ₹4 L/yr - ₹10.9 L/yr |
Assistant Manager
209
salaries
| ₹4 L/yr - ₹12.1 L/yr |
Asst Store
206
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Store Executive
190
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Structural Engineer
179
salaries
| ₹2 L/yr - ₹6.7 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures