Filter interviews by
The most commonly used welding method for tube pipe is the Tungsten Inert Gas (TIG) welding.
TIG welding is preferred for tube pipe welding due to its high precision and clean welds.
It uses a non-consumable tungsten electrode to create the arc and a shielding gas to protect the weld area.
TIG welding is suitable for various materials like stainless steel, aluminum, and copper.
It provides excellent control over the weldin...
A cutting tool commonly used for cutting tubes is called a tube cutter.
Tube cutter is a hand tool used to cut through various types of tubes.
It typically consists of a cutting wheel that is rotated around the tube to create a clean cut.
Tube cutters are commonly used in plumbing, HVAC, and automotive industries.
Examples of tube cutters include pipe cutters, copper tube cutters, and PVC tube cutters.
The least count of Vernier calipers is the smallest measurement that can be read on the scale.
The least count is determined by the number of divisions on the main scale and the Vernier scale.
It is calculated by dividing the smallest division on the main scale by the total number of divisions on the Vernier scale.
For example, if the smallest division on the main scale is 0.1 mm and the total number of divisions on the V...
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
I applied via Job Portal and was interviewed in Jul 2021. There were 3 interview rounds.
Dewas Metal Sections interview questions for popular designations
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in May 2021. There was 1 interview round.
posted on 17 Nov 2022
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
PTP process stands for Procure-to-Pay process, which involves the steps from purchasing goods/services to making payment.
PTP process starts with requisitioning of goods/services by a department.
Next step involves obtaining quotes, selecting a vendor, and creating a purchase order.
Goods/services are received, and invoices are matched with the purchase order.
Payment is made to the vendor based on the invoice.
The process ...
based on 3 interviews
Interview experience
based on 33 reviews
Rating in categories
Production Engineer
11
salaries
| ₹1.9 L/yr - ₹4 L/yr |
Junior Engineer
8
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Accounts Officer
7
salaries
| ₹3 L/yr - ₹5 L/yr |
Engineer
6
salaries
| ₹2.3 L/yr - ₹4.2 L/yr |
Mechanical Engineer
6
salaries
| ₹1.9 L/yr - ₹3.2 L/yr |
Ashapura Group Of Industries
Rio Tinto
Propel Industries
Pilot Industries