Filter interviews by
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
Deco paints are decorative paints used for interior and exterior surfaces to enhance aesthetics.
Deco paints come in a variety of colors and finishes such as matte, satin, and gloss.
They are typically used on walls, ceilings, and trim to add color and texture to a space.
Some examples of deco paints include acrylic paints, latex paints, and enamel paints.
A modular kitchen is a pre-made kitchen design made up of standardized components that can be easily assembled and customized to fit a specific space.
Consists of pre-made cabinets, countertops, and appliances that can be easily installed
Allows for easy customization and flexibility in design
Can be easily disassembled and moved to a new location if needed
Popular for its modern and sleek look
Examples: IKEA kitchen system
Modular furniture is pre-made and can be easily assembled and disassembled, while traditional furniture is typically larger and more permanent.
Modular furniture is usually made up of individual pieces that can be rearranged or added to, providing flexibility in design and function.
Traditional furniture is typically larger and more solidly constructed, often requiring professional assembly and disassembly.
Modular furnit...
I appeared for an interview in Aug 2017.
I applied via Referral and was interviewed before May 2020. There was 1 interview round.
Rate analysis is the process of determining the unit cost of a particular item or activity in a construction project.
Identify the item or activity to be analyzed
Determine the quantity of materials and labor required
Calculate the cost of materials and labor
Add overhead costs and profit margin
Divide the total cost by the quantity to get the unit rate
Compare the rate with market rates to ensure competitiveness
Components to be considered in Rate analysis
Cost of materials
Cost of labor
Cost of equipment
Overhead expenses
Profit margin
Taxes and duties
Transportation costs
Wastage and spoilage
Contingencies
Productivity rates
Market rates
Inflation rates
The documents required to certify the final bill as a Quantity Surveyor.
Contract documents
Measurement records
Variation orders
Payment certificates
Final account statement
As-built drawings
Completion certificates
Test reports
Subcontractor invoices
Material invoices
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
Cost to complete refers to the estimated amount of money required to finish a project or task.
Cost to complete is an important metric used in project management and quantity surveying.
It takes into account the remaining work, resources, and expenses needed to complete a project.
It helps in assessing the financial status of a project and making informed decisions.
Cost to complete can be calculated by subtracting the act...
Unit weight of steel bars varies based on their diameter and length.
The weight of steel bars is measured in kilograms per meter (kg/m).
The unit weight of steel bars ranges from 0.785 kg/m to 6.16 kg/m depending on their diameter.
For example, a 10mm diameter steel bar weighs around 0.62 kg/m while a 32mm diameter steel bar weighs around 6.16 kg/m.
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
Hazards of work at height include falls, falling objects, unstable surfaces, and weather conditions.
Falls from height can result in serious injuries or fatalities
Objects falling from height can cause harm to workers below
Unstable surfaces such as ladders or scaffolding can lead to slips or falls
Weather conditions like wind or rain can increase the risk of accidents
Improper use of safety equipment can also contribute to
Hazard Control Hierarchy is a system used to prioritize and implement control measures to reduce or eliminate workplace hazards.
Hierarchy of controls ranks control measures from most effective to least effective: Elimination, Substitution, Engineering Controls, Administrative Controls, Personal Protective Equipment (PPE)
The goal is to eliminate or reduce hazards at the source rather than relying on PPE
Example: Instead ...
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
Hackerone test link was there
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
That are designed to evaluate a developer's coding skills and apptitude
I have extensive experience in safety management, strong attention to detail, and a proven track record of reducing workplace incidents.
10+ years of experience in safety management
Implemented safety protocols resulting in 30% decrease in workplace incidents
Strong attention to detail in identifying and addressing safety hazards
Certified in OSHA regulations and emergency response procedures
based on 1 interview
Interview experience
Design Engineer
5
salaries
| ₹1.8 L/yr - ₹9 L/yr |
Software Engineer
4
salaries
| ₹5 L/yr - ₹5 L/yr |
Graphic Designer
4
salaries
| ₹1.8 L/yr - ₹8 L/yr |
Lead Engineer
4
salaries
| ₹9.5 L/yr - ₹15 L/yr |
Interior Designer
4
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Alstom Transportation
Tata Technologies
Saint-Gobain
AECOM