Columns are vertical structures used for support while vessels are horizontal structures used for storage or transportation of fluids.
Columns are used for structural support while vessels are used for storage or transportation of fluids.
Columns are usually vertical while vessels are usually horizontal.
Columns are commonly found in buildings and bridges while vessels are commonly found in chemical plants and refineries.
...
Exchanger is a device used to transfer heat from one fluid to another.
Exchangers can be of various types such as shell and tube, plate, or spiral
They work on the principle of heat transfer through conduction
The hot fluid flows through the exchanger and transfers its heat to the cold fluid
The two fluids are kept separate by a barrier to prevent mixing
Exchangers are commonly used in HVAC systems, chemical plants, and ref
There are various types of permits required for mechanical work depending on the nature of the work.
There are hot work permits for welding and cutting operations.
Confined space permits for work in enclosed spaces.
Lockout/tagout permits for maintenance work on machinery.
Excavation permits for digging and trenching work.
Electrical permits for electrical work.
Permits for working at heights.
Permits for hazardous materials ...
If a person is injured inside a confined space, I would follow a set of steps to ensure their safety and provide immediate medical attention if necessary.
Assess the situation and ensure personal safety before entering the confined space.
Call for help and inform the relevant authorities about the incident.
Provide first aid or CPR if trained and necessary.
If the injury is severe or life-threatening, evacuate the injured ...
I will follow the emergency procedures and evacuate the area immediately.
I will stop all ongoing work and shut down any equipment that can be safely shut down.
I will follow the emergency evacuation plan and exit the area as quickly as possible.
I will report to the designated assembly point and wait for further instructions.
If necessary, I will assist in the evacuation of others who may need help.
I will not return to th...
Necessary documents for a permit include risk assessment, work method statement, and safety procedures.
Risk assessment
Work method statement
Safety procedures
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed in Dec 2023. There were 2 interview rounds.
Hydrojetting safety involves following proper procedures and using appropriate protective equipment to prevent accidents and injuries.
Ensure all personnel involved in hydrojetting are trained on safety protocols
Wear appropriate personal protective equipment (PPE) such as gloves, goggles, and protective clothing
Inspect and maintain hydrojetting equipment regularly to ensure safe operation
Follow proper lockout/tagout pro...
Descon Engineering interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
I have 5 years of experience in equipment inspection, including conducting routine checks, identifying defects, and ensuring compliance with safety standards.
Performed regular inspections on machinery to ensure proper functioning
Identified and documented any defects or malfunctions for immediate repair
Ensured all equipment met safety standards and regulations
Collaborated with maintenance team to address any issues foun
Hydrotest is a process of pressure testing plant piping to ensure it can safely contain fluids under pressure.
Hydrotest is done to check for leaks, strength, and integrity of the piping system.
Water or another liquid is used to pressurize the system to a specified pressure for a set duration.
Pressure gauges and sensors are used to monitor the pressure during the test.
After the test, the system is inspected for any leak...
Hydrotesting requirements involve testing pressure vessels to ensure they can safely contain fluids under pressure.
Hydrotesting is a common method used to check the structural integrity of pressure vessels.
It involves filling the vessel with water or another fluid and pressurizing it to a specified level.
The vessel is then inspected for leaks or deformations that could indicate weaknesses.
Hydrotesting requirements may ...
Get interview-ready with Top Descon Engineering Interview Questions
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
JMS stands for Java Message Service, a messaging standard that allows Java applications to create, send, receive, and read messages.
JMS is a Java API for messaging between software components.
It provides a common way for Java programs to create, send, receive, and read messages.
JMS can be used for asynchronous communication between distributed systems.
JMS messages are sent to and received from destinations such as queu...
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 2 interview rounds.
A hydrotest procedure is a method used to test the integrity and strength of a pressure vessel or pipeline by subjecting it to high-pressure water.
Hydrotest procedures involve filling the vessel or pipeline with water and pressurizing it to a specified level.
The pressure is held for a certain duration to check for any leaks or deformations.
The test pressure is typically higher than the operating pressure to ensure safe...
posted on 26 Sep 2023
I applied via Recruitment Consulltant
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 4 interview rounds.
QC Supervisor is responsible for overseeing quality control processes, ensuring compliance with regulations, managing QC team, and implementing quality improvement initiatives.
Overseeing quality control processes to ensure products meet quality standards
Ensuring compliance with regulations and standards set by regulatory bodies
Managing and leading QC team to achieve department goals
Implementing quality improvement init...
Testing of piping involves various methods to ensure quality and safety.
Pressure testing to check for leaks
Visual inspection for defects or damage
Ultrasonic testing for thickness measurement
Dye penetrant testing for surface cracks
Radiographic testing for internal defects
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
Top trending discussions
The duration of Descon Engineering interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 18 interviews
Interview experience
based on 330 reviews
Rating in categories
Safety Officer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Supervisor
23
salaries
| ₹0 L/yr - ₹0 L/yr |
HSE Supervisor
17
salaries
| ₹0 L/yr - ₹0 L/yr |
HSE Officer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
TCS
BHEL
Thermax Limited