Upload Button Icon Add office photos

Filter interviews by

Dee Piping System Cost Estimation Engineer Interview Questions and Answers

Updated 3 Feb 2025

Dee Piping System Cost Estimation Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Aptitude Test 

Working experience related questions.

Round 2 - Technical 

(3 Questions)

  • Q1. Costing related questions.
  • Q2. Technical question related to welding process.
  • Q3. Knowledge of Advance Excel, process knowledge, Tooling knowledge and commerical documents knowledge must.

Interview Preparation Tips

Interview preparation tips for other job seekers - This is a good company to improve your skills and strong technical points.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Sep 2024. There were 3 interview rounds.

Round 1 - Assignment 

Core q were there, which is related to process and industrial instrumentation

Round 2 - Technical 

(3 Questions)

  • Q1. Valve related q
  • Q2. Cost estimation
  • Q3. General talk regarding campus , company
Round 3 - HR 

(2 Questions)

  • Q1. Resume grinding
  • Q2. Why do u want to join
  • Ans. 

    I am passionate about utilizing my skills in estimation and engineering to contribute to the growth and success of the company.

    • I have a strong background in engineering and estimation, making me well-suited for the role.

    • I am excited about the opportunity to work on challenging projects and contribute to the company's success.

    • I believe that my skills and experience align well with the requirements of the position.

    • I am e...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - good company but not got offered as other guy having high GPA and they have came for one position only

Dee Piping System Interview FAQs

How many rounds are there in Dee Piping System Cost Estimation Engineer interview?
Dee Piping System interview process usually has 2 rounds. The most common rounds in the Dee Piping System interview process are Aptitude Test and Technical.
What are the top questions asked in Dee Piping System Cost Estimation Engineer interview?

Some of the top questions asked at the Dee Piping System Cost Estimation Engineer interview -

  1. Knowledge of Advance Excel, process knowledge, Tooling knowledge and commerical...read more
  2. Technical question related to welding proce...read more
  3. Costing related questio...read more

Tell us how to improve this page.

Dee Piping System Cost Estimation Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Apco Infratech Interview Questions
3.7
 • 111 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
Bechtel Interview Questions
4.0
 • 65 Interviews
Samsung E&A Interview Questions
4.1
 • 59 Interviews
Wood Group Interview Questions
3.7
 • 56 Interviews
View all
Assistant Engineer
94 salaries
unlock blur

₹2.9 L/yr - ₹5.4 L/yr

Assistant Manager
77 salaries
unlock blur

₹6.7 L/yr - ₹12.9 L/yr

Engineer
74 salaries
unlock blur

₹3.2 L/yr - ₹7.5 L/yr

Senior Engineer
73 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Junior Engineer
67 salaries
unlock blur

₹2.8 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Dee Piping System with

L&T Energy Hydrocarbon

3.9
Compare

AECOM

4.3
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview