The cause of damaging MHV in first 3 hoppers is likely due to improper maintenance and lack of regular inspections.
Lack of regular maintenance checks on the MHV in the first 3 hoppers
Possible wear and tear on the MHV components leading to damage
Inadequate training of staff on proper handling and operation of the MHV
Potential issues with the design or installation of the MHV system
Gland packing in pumps is used to prevent leakage of fluid along the pump shaft.
Gland packing is a material placed around the pump shaft to create a seal between the shaft and the pump housing.
It helps prevent leakage of fluid from the pump, ensuring efficient operation.
Gland packing needs to be regularly checked and replaced to maintain its effectiveness.
Common materials used for gland packing include graphite, PTFE, ...
Shutoff vacuum is the point at which a vacuum pump stops working due to reaching its maximum pressure limit.
Shutoff vacuum is the maximum pressure limit at which a vacuum pump ceases to operate.
It is important to know the shutoff vacuum to prevent damage to the pump.
Regular maintenance and monitoring of the shutoff vacuum is necessary to ensure proper functioning of the vacuum pump.
I applied via Naukri.com
Billing process involves generating invoices and collecting payments for goods or services provided.
Creating invoices based on the goods or services provided
Sending invoices to customers
Tracking payments received and outstanding balances
Following up with customers on overdue payments
Recording payments in accounting software
Generating financial reports on billing activity
Suppliers bill certification process involves verifying and approving invoices from suppliers.
The supplier sends an invoice for goods or services provided
The invoice is checked for accuracy and completeness
The invoice is matched with the purchase order and delivery receipt
The invoice is approved for payment if all information is correct
The payment is made to the supplier
BBU stands for Baseband Unit and MDCC stands for Multi-Domain Command and Control.
BBU is a key component in a cellular network that processes and transmits data between the user's device and the core network.
MDCC is a system used by the military to coordinate and control operations across multiple domains, such as land, sea, air, and space.
BBU and MDCC are two different concepts used in different fields, but both are i...
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
PV solar refers to photovoltaic solar technology, which converts sunlight into electricity using solar panels.
PV solar technology uses solar panels made of photovoltaic cells to convert sunlight into electricity.
The rejection rate of cells by a company can vary depending on the quality control measures in place.
Topcon Technology is a solar cell manufacturing technique that involves creating a thin layer of semiconducto...
I appeared for an interview before Feb 2024.
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Using PSCAD to create a grid-tied wind power plant
Create a new project in PSCAD
Design the wind turbine system with appropriate parameters
Connect the wind turbine system to the grid
Simulate the system to analyze its performance
Optimize the design for maximum efficiency
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
I have extensive experience in global procurement process, supplier relationship management, end to end procurement, and cross functional collaboration.
Successfully managed global procurement process by identifying cost-saving opportunities and negotiating contracts with suppliers.
Faced challenges in supplier relationship management due to communication barriers, but resolved them by establishing regular meetings and c...
To tackle problems in procurement, it is important to identify root causes, establish clear communication channels, implement efficient processes, and continuously monitor performance.
Identify root causes of procurement problems such as supplier issues, inventory management issues, or process inefficiencies.
Establish clear communication channels with suppliers, stakeholders, and internal teams to ensure transparency an...
Understanding of sourcing goods and services from global markets.
Knowledge of international trade regulations and tariffs
Ability to identify and evaluate global suppliers
Experience in negotiating contracts with overseas vendors
Awareness of currency exchange rates and their impact on procurement costs
We work with a variety of suppliers globally to ensure a diverse and reliable supply chain.
We have partnerships with suppliers in Asia, Europe, and North America.
Our suppliers range from small local businesses to large multinational corporations.
We prioritize suppliers who share our commitment to sustainability and ethical practices.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
based on 3 interviews
Interview experience
based on 22 reviews
Rating in categories
Assistant Manager
59
salaries
| ₹4.7 L/yr - ₹9.1 L/yr |
Deputy Manager
54
salaries
| ₹3.8 L/yr - ₹11.6 L/yr |
Manager
48
salaries
| ₹6 L/yr - ₹16.5 L/yr |
Senior Engineer
30
salaries
| ₹4 L/yr - ₹7.7 L/yr |
Engineer
21
salaries
| ₹3 L/yr - ₹5 L/yr |
ReNew
Adani Green Energy
Vestas
Jakson Group