Filter interviews by
PPM stands for Parts Per Million, a unit used to measure the concentration of a substance in a solution.
PPM is a ratio of the number of parts of a substance to one million parts of the solution.
It is commonly used in various industries to express the level of impurities or contaminants in a product or environment.
For example, in water treatment, PPM is used to measure the concentration of chemicals or pollutants in the...
Fire alarm cable is a type of cable used in fire alarm systems to transmit signals from detectors to the control panel.
Fire alarm cable is designed to withstand high temperatures and prevent the spread of fire.
It is typically made of copper conductors with a fire-resistant insulation.
The cable is color-coded to indicate its purpose, such as red for power and black for ground.
Using fire alarm cable ensures reliable tran...
Top trending discussions
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
I was interviewed in Jun 2024.
I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.
To solve site situations, it is important to assess the problem, communicate effectively with team members, implement a solution, and monitor progress.
Assess the situation by identifying the root cause of the problem
Communicate effectively with team members to gather input and feedback
Implement a solution by creating an action plan and assigning tasks
Monitor progress by regularly checking in on the situation and adjust
Safety and de-snagging are important aspects of ensuring a safe and efficient work environment on construction sites.
Safety involves implementing measures to prevent accidents and injuries on site.
De-snagging refers to the process of removing obstacles or hazards that could potentially cause harm to workers.
Examples of safety measures include providing proper training, enforcing the use of personal protective equipment...
I applied via Naukri.com and was interviewed before Oct 2022. There was 1 interview round.
After RCC, finishing activities can be started by following a systematic approach to ensure quality and efficiency.
Inspect the RCC work to ensure it meets quality standards
Prepare the surface for finishing by cleaning and leveling
Start with plastering, painting, flooring, and other finishing works in a sequential manner
Coordinate with other trades to ensure smooth progress of finishing activities
Regularly inspect and m...
The sequence of finishing activities typically involves painting, flooring, installation of fixtures, and final cleaning.
Painting walls and ceilings
Installing flooring such as tiles or hardwood
Fixtures installation like lights, faucets, and cabinets
Final cleaning of the area
Waterproof treatment involves applying materials to prevent water penetration into structures.
Surface preparation including cleaning and repairing any cracks or holes
Application of waterproofing materials such as membranes, coatings, or sealants
Ensuring proper curing and drying time for the materials to effectively seal the surface
Regular maintenance and inspection to ensure long-lasting waterproofing
Examples: using bi...
There are primarily two types of waterproof treatments for wet areas: surface waterproofing and integral waterproofing.
Surface waterproofing involves applying a waterproof coating or membrane on the surface of the wet area to prevent water penetration.
Integral waterproofing involves adding waterproofing agents directly into the concrete mix to make the structure itself waterproof.
Examples of surface waterproofing inclu...
Mix proportion refers to the ratio of different materials used in a concrete mix to achieve desired properties.
Mix proportion is typically expressed as the ratio of cement, sand, and aggregate in a concrete mix.
For example, a common mix proportion for concrete is 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts aggregate.
The mix proportion can vary depending on the desired strength, workability, and durabili
posted on 13 Oct 2022
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
There are several types of water supply pipes available in the market. Some of the popular ones are copper, PVC, PEX, and galvanized steel.
Copper pipes are durable and resistant to corrosion. They are commonly used in residential and commercial buildings.
PVC pipes are lightweight and easy to install. They are commonly used in irrigation systems and swimming pools.
PEX pipes are flexible and easy to install. They are com...
There are various types of drainage pipes available in the market with different make names.
PVC pipes - made by companies like Astral, Finolex, and Supreme
HDPE pipes - made by companies like Jain Irrigation, Kisan, and Prince
Cast iron pipes - made by companies like Tata, Jindal, and Electrosteel
Concrete pipes - made by companies like Hume, RCP, and Hanson
Corrugated pipes - made by companies like ADS, NDS, and Timewell
Sprinklers are classified based on temperature and color code. Each type is designed for specific fire hazards.
Blue: 57°C (135°F) - Ordinary Combustibles
Orange: 68°C (155°F) - Flammable Liquids
Red: 79°C (175°F) - Electrical Equipment
Green: 93°C (200°F) - Storage
Yellow: 141°C (286°F) - Extra High Temperature
Purple: 182°C (360°F) - Extreme High Temperature
System testing and commissioning involves verifying and validating the functionality of a system before it is put into operation.
Develop a test plan that outlines the testing process and criteria
Execute the test plan to ensure that the system meets the requirements
Document any issues or defects found during testing
Fix any issues or defects and retest
Once testing is complete, commission the system by putting it into ope...
Handover process involves transferring responsibility and ownership of a project or facility from one party to another.
Ensure all necessary documentation is complete and accurate
Conduct a thorough inspection of the project or facility
Provide training and orientation to the new party
Establish clear communication channels for ongoing support
Obtain sign-off and acknowledgement of the handover
Examples: handover of a constr...
posted on 14 Jun 2021
My yearly increment is based on my performance and the company's financial performance.
My yearly increment is determined by a performance review process.
The company evaluates my performance based on my achievements, skills, and contributions.
The increment amount is also influenced by the company's financial performance and budget.
I have consistently received positive feedback and higher increments due to my exceptional...
Relationship Manager
14
salaries
| ₹18 L/yr - ₹21 L/yr |
Facility Engineer
6
salaries
| ₹5 L/yr - ₹12 L/yr |
Sales Manager
6
salaries
| ₹20 L/yr - ₹49 L/yr |
International Business Development Manager
5
salaries
| ₹15 L/yr - ₹42 L/yr |
IT Engineer
5
salaries
| ₹12 L/yr - ₹17 L/yr |
Sobha
Prestige Group
Godrej Properties
DLF