Filter interviews by
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
Top trending discussions
posted on 20 Jul 2017
posted on 9 Aug 2022
I applied via Referral
posted on 26 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Yes, ACB settings refer to the settings of Air Circuit Breakers used in electrical systems.
ACB settings include parameters such as overload protection, short circuit protection, and ground fault protection.
These settings can be adjusted based on the specific requirements of the electrical system.
For example, the trip unit of an ACB can be set to trip at a certain current level to protect the system from overloads.
Power factor is a measure of how effectively electrical power is being used in a system.
Power factor is the ratio of real power (kW) to apparent power (kVA) in an electrical system.
It indicates how efficiently power is being converted into useful work.
A power factor of 1 indicates all power is being used effectively, while a lower power factor means some power is being wasted.
Power factor correction can be used to impr
I will first check the cause of the trip, reset the ACB, and then investigate further if needed.
Check the cause of the trip - look for any overload, short circuit, or earth fault
Reset the ACB by switching it off and then on again
Investigate further if needed - check for any faulty components or wiring
VRF stands for Variable Refrigerant Flow and is a type of HVAC system that uses refrigerant as the cooling and heating medium. AHU stands for Air Handling Unit and is a device used to condition and circulate air as part of an HVAC system.
VRF systems use refrigerant to directly cool or heat the space, while AHUs use chilled or heated water to condition the air before distributing it.
VRF systems are more energy efficient...
I applied via Walk-in
The SOP (Standard Operating Procedure) of all works is a set of documented instructions that outline the steps to be followed for completing tasks.
SOPs provide consistency and ensure that tasks are performed correctly and efficiently.
They help in training new employees and serve as a reference guide for existing employees.
SOPs can cover various aspects such as safety procedures, quality control, maintenance, and troubl...
DLR stands for Detailed Project Report and DPR stands for Detailed Design Report. They are both important documents in engineering projects.
DLR is prepared before the start of a project and includes detailed information about the project scope, objectives, feasibility, and cost estimates.
DPR is prepared during the design phase of a project and provides detailed information about the design specifications, calculations,...
The quantity achieved is dependent on the manpower available.
The more manpower available, the higher the quantity that can be achieved.
Efficient utilization of manpower can lead to higher productivity.
Manpower shortage can result in lower quantity achieved.
Automation and technology can help in achieving higher quantity with less manpower.
Proper planning and coordination are essential to optimize manpower and achieve de
posted on 29 Aug 2024
I applied via Naukri.com
Technical questions about the Revit and MEP
posted on 15 Jun 2024
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
posted on 16 Feb 2025
I was interviewed before Feb 2024.
Relationship Manager
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Facility Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Sales Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
International Business Development Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
IT Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Sobha
Prestige Group
Godrej Properties
DLF