Currie & Brown
10+ S Naidu Tech Interview Questions and Answers
Q1. Method of measurement for various products and conversion factor
Method of measurement and conversion factors are crucial for MEP Quantity Surveyor.
Understand the standard method of measurement for each product
Be aware of the conversion factors for different units of measurement
Use software tools to assist with calculations and conversions
Examples of units of measurement include square meters, cubic meters, and linear meters
Q2. What is action points at site level
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necessary permits, or scheduling inspections.
Tracking and addres...read more
Q3. What is status of company
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Q4. What is employee growth
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Q5. What is bank guarantee
A bank guarantee is a promise from a bank to cover a specific amount of debt or liability on behalf of a borrower.
It is a type of financial instrument used to mitigate risk in business transactions.
It is often required by parties engaging in international trade or construction projects.
The bank guarantee ensures that the beneficiary will receive payment if the borrower fails to fulfill their obligations.
Types of bank guarantees include bid bonds, performance bonds, and advanc...read more
Q6. Rate analysis of different items
Rate analysis involves calculating the cost of different items in a construction project.
Rate analysis is used to estimate the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the cost of each item into its components, such as the cost of materials, labor, and overhead.
Examples of items that require rate analysis include excavation, concrete work, electrical work, and plumbing.
Rate analysis helps ensure that the project is completed...read more
Q7. The formula of duct areas
The formula for duct areas is used to calculate the cross-sectional area of a duct.
The formula for rectangular ducts is A = l x w
The formula for circular ducts is A = πr²
The formula for oval ducts is A = πab/4
A represents the cross-sectional area of the duct
l represents the length of the duct
w represents the width of the duct
r represents the radius of the duct
a and b represent the major and minor axes of the oval duct
Q8. What is the shape of project progress curve?
The shape of project progress curve is typically an S-curve.
The project progress curve starts off slow as the project is initiated and planned.
It then accelerates as work is being executed and completed.
Finally, the curve levels off as the project nears completion and final tasks are finished.
The S-curve represents the typical pattern of project progress over time.
Q9. Current CTC and expected CTC.
Current CTC is $50,000 and expected CTC is $60,000.
Current CTC: $50,000
Expected CTC: $60,000
Reason for increase in expected CTC: Additional qualifications and experience gained since current CTC was set
Q10. International Code of measurement
The International Code of Measurement is a standard for measuring construction works globally.
The code provides guidelines for measuring and quantifying construction works.
It ensures consistency in measurement and helps avoid disputes.
It covers areas such as measurement of quantities, units of measurement, and presentation of measurements.
Examples of codes include SMM7, CESMM3, and POMI.
The code is used by quantity surveyors, contractors, and clients in the construction indus...read more