Q1. Method of measurement for various products and conversion factor

Ans.

Method of measurement and conversion factors are crucial for MEP Quantity Surveyor.

  • Understand the standard method of measurement for each product

  • Be aware of the conversion factors for different units of measurement

  • Use software tools to assist with calculations and conversions

  • Examples of units of measurement include square meters, cubic meters, and linear meters

View 1 answer

Q2. What is action points at site level

Ans.

Action points at site level refer to specific tasks or activities that need to be completed on the construction site.

  • Action points are typically identified during site inspections or progress meetings.

  • They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.

  • Examples of action points could be revising drawings to address conflicts, obtaining necessary permits, or scheduling inspections.

  • Tracking and addres...read more

Add your answer

Q3. What is status of company

Ans.

The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.

  • Company has a strong financial position

  • Ongoing projects are in progress

  • Company has a good reputation in the industry

Add your answer

Q4. What is employee growth

Ans.

Employee growth refers to the development and advancement of an individual within their career.

  • Employee growth involves acquiring new skills and knowledge

  • It includes taking on more responsibilities and challenges

  • Career progression and promotions are indicators of employee growth

Add your answer
Discover S Naidu Tech interview dos and don'ts from real experiences

Q5. What is bank guarantee

Ans.

A bank guarantee is a promise from a bank to cover a specific amount of debt or liability on behalf of a borrower.

  • It is a type of financial instrument used to mitigate risk in business transactions.

  • It is often required by parties engaging in international trade or construction projects.

  • The bank guarantee ensures that the beneficiary will receive payment if the borrower fails to fulfill their obligations.

  • Types of bank guarantees include bid bonds, performance bonds, and advanc...read more

Add your answer

Q6. Rate analysis of different items

Ans.

Rate analysis involves calculating the cost of different items in a construction project.

  • Rate analysis is used to estimate the cost of materials, labor, and equipment for each item in a project.

  • It involves breaking down the cost of each item into its components, such as the cost of materials, labor, and overhead.

  • Examples of items that require rate analysis include excavation, concrete work, electrical work, and plumbing.

  • Rate analysis helps ensure that the project is completed...read more

Add your answer

Q7. The formula of duct areas

Ans.

The formula for duct areas is used to calculate the cross-sectional area of a duct.

  • The formula for rectangular ducts is A = l x w

  • The formula for circular ducts is A = πr²

  • The formula for oval ducts is A = πab/4

  • A represents the cross-sectional area of the duct

  • l represents the length of the duct

  • w represents the width of the duct

  • r represents the radius of the duct

  • a and b represent the major and minor axes of the oval duct

Add your answer

Q8. What is the shape of project progress curve?

Ans.

The shape of project progress curve is typically an S-curve.

  • The project progress curve starts off slow as the project is initiated and planned.

  • It then accelerates as work is being executed and completed.

  • Finally, the curve levels off as the project nears completion and final tasks are finished.

  • The S-curve represents the typical pattern of project progress over time.

Add your answer

Q9. Current CTC and expected CTC.

Ans.

Current CTC is $50,000 and expected CTC is $60,000.

  • Current CTC: $50,000

  • Expected CTC: $60,000

  • Reason for increase in expected CTC: Additional qualifications and experience gained since current CTC was set

Add your answer

Q10. International Code of measurement

Ans.

The International Code of Measurement is a standard for measuring construction works globally.

  • The code provides guidelines for measuring and quantifying construction works.

  • It ensures consistency in measurement and helps avoid disputes.

  • It covers areas such as measurement of quantities, units of measurement, and presentation of measurements.

  • Examples of codes include SMM7, CESMM3, and POMI.

  • The code is used by quantity surveyors, contractors, and clients in the construction indus...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at S Naidu Tech

based on 4 interviews in the last 1 year
Interview experience
5.0
Excellent
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 4.3k Interview Questions
3.8
 • 2.9k Interview Questions
3.6
 • 1.7k Interview Questions
3.9
 • 675 Interview Questions
3.9
 • 253 Interview Questions
4.1
 • 133 Interview Questions
View all
Top Currie & Brown Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter