I applied via Company Website and was interviewed before Sep 2020. There were 5 interview rounds.
Camber is the slope provided to the road surface to drain off rainwater.
It is the convexity provided to the road surface.
It is measured in percentage or millimeters per meter.
It helps in draining off rainwater from the road surface.
It prevents the accumulation of water on the road surface.
It improves the safety of the road by reducing the risk of skidding.
Example: A camber of 2% means a rise of 2 cm for every meter of
Top trending discussions
Method of estimation refers to the process of calculating the approximate cost of a project or task.
Estimation can be done using various methods such as approximate quantities method, detailed estimate method, and unit rate method.
Factors such as labor cost, material cost, equipment cost, and overheads are taken into consideration while estimating.
Estimation can be done manually or using software such as AutoCAD, Excel...
The ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.
The most common ratio of concrete is 1:2:3, which means one part cement, two parts sand, and three parts aggregate.
Other ratios include 1:1.5:3 and 1:3:6, depending on the strength and durability required for the project.
The ratio of concrete can also be adjusted based on the type of project, climate conditions, and availa...
Substructure refers to the part of a building or structure that is below ground level, while superstructure refers to the part above ground level.
Substructure includes foundation, basement, and retaining walls
Superstructure includes columns, beams, walls, and roof
Substructure is responsible for transferring loads to the ground, while superstructure provides support for the building or structure
Examples of substructure ...
I applied via Walk-in
Method of estimation refers to the process of calculating the approximate cost of a project or task.
Estimation can be done using various methods such as approximate quantities method, detailed estimate method, and unit rate method.
Factors such as labor cost, material cost, equipment cost, and overheads are taken into consideration while estimating.
Estimation can be done manually or using software such as AutoCAD, Excel...
The ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.
The most common ratio of concrete is 1:2:3, which means one part cement, two parts sand, and three parts aggregate.
Other ratios include 1:1.5:3 and 1:3:6, depending on the strength and durability required for the project.
The ratio of concrete can also be adjusted based on the type of project, climate conditions, and availa...
Substructure refers to the part of a building or structure that is below ground level, while superstructure refers to the part above ground level.
Substructure includes foundation, basement, and retaining walls
Superstructure includes columns, beams, walls, and roof
Substructure is responsible for transferring loads to the ground, while superstructure provides support for the building or structure
Examples of substructure ...
I applied via Naukri.com and was interviewed before Jun 2021. There were 3 interview rounds.
Data Entry Operator
10
salaries
| ₹1.8 L/yr - ₹2.9 L/yr |
Financial Management and Procurement Mentor
9
salaries
| ₹2.8 L/yr - ₹3 L/yr |
Senior Executive Operations
7
salaries
| ₹2 L/yr - ₹3 L/yr |
Operations Executive
6
salaries
| ₹2 L/yr - ₹2.2 L/yr |
Facility Manager
6
salaries
| ₹2.9 L/yr - ₹3.8 L/yr |
Sodexo
JLL
CBRE
Compass Group Support Services