Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Apr 2021. There were 3 interview rounds.
posted on 1 Feb 2021
I applied via Campus Placement and was interviewed in Aug 2020. There was 1 interview round.
I applied via LinkedIn and was interviewed in Mar 2022. There were 2 interview rounds.
Temperature and irradiance affect the performance and efficiency of solar panels.
High temperatures can decrease the efficiency of solar panels.
Increased irradiance levels can lead to higher power output.
Temperature coefficient determines the panel's performance at different temperatures.
Irradiance levels vary based on factors like time of day, weather conditions, and panel orientation.
Temperature and irradiance should
Co-generation plants produce both electricity and heat. They can be linked with solar PV plants to increase energy efficiency.
Co-generation plants use a single fuel source to produce both electricity and heat
Solar PV plants generate electricity from sunlight
Linking co-generation plants with solar PV plants can increase overall energy efficiency
Excess heat from co-generation plants can be used to power solar thermal sys...
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
posted on 18 Mar 2025
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Campus Placement and was interviewed before Dec 2023. There were 2 interview rounds.
It was very easy in the aptitude
based on 1 interview
Interview experience
Deputy Manager
35
salaries
| ₹7.5 L/yr - ₹13.5 L/yr |
Associate Manager
32
salaries
| ₹10 L/yr - ₹19 L/yr |
Design Engineer
27
salaries
| ₹2.7 L/yr - ₹6.6 L/yr |
Junior Engineer
23
salaries
| ₹1.9 L/yr - ₹3.5 L/yr |
Senior Design Engineer
17
salaries
| ₹3.5 L/yr - ₹9.4 L/yr |
John Deere
Caterpillar Inc
TÜV SÜD
Atlas Copco