A Civil Site Engineer was asked 5d ago
Q. How do you check concrete material quality?
Ans. 

To check concrete material, assess its quality through tests for strength, workability, and composition.

  • Conduct a slump test to measure workability and consistency of fresh concrete.

  • Perform a compressive strength test using concrete cubes or cylinders after curing.

  • Check for proper grading and cleanliness of aggregates used in the mix.

  • Verify the water-cement ratio to ensure durability and strength.

  • Inspect for any s...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked 5d ago
Q. What is the process of foundation construction?
Ans. 

The foundation process involves site preparation, excavation, and construction of a stable base for structures.

  • Site Investigation: Assess soil type and load-bearing capacity.

  • Excavation: Digging to the required depth based on design specifications.

  • Foundation Types: Choose between shallow (e.g., spread footings) or deep foundations (e.g., piles) based on soil conditions.

  • Formwork: Construct temporary molds for concre...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked 5d ago
Q. What is surveying?
Ans. 

Surveying is the science of measuring distances, angles, and elevations to determine land boundaries and create maps.

  • Types of surveys include land surveys, topographic surveys, and construction surveys.

  • Land surveys establish property boundaries, often using tools like theodolites.

  • Topographic surveys map the terrain, showing elevation changes and natural features.

  • Construction surveys ensure that structures are buil...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked 5d ago
Q. How do you calculate a Bar Bending Schedule (BBS)?
Ans. 

BBS (Bar Bending Schedule) is a detailed list of reinforcement bars required for construction, including their dimensions and quantities.

  • Identify the structural elements (beams, columns, slabs) requiring reinforcement.

  • Calculate the total length of each type of bar needed based on design drawings.

  • Determine the diameter and grade of the bars as specified in the design.

  • List the cut lengths of bars, accounting for ben...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked 5d ago
Q. What is a center line layout?
Ans. 

Center line layout is a method used in construction to establish the precise location of structural elements.

  • It involves marking the center lines of walls, columns, and other structural components on the ground.

  • This layout ensures accurate alignment and spacing of elements during construction.

  • For example, in a building, center lines help in positioning walls relative to each other.

  • It is crucial for maintaining sym...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked 5d ago
Q. How do you calculate quantity surveying?
Ans. 

Quantity surveying involves estimating material quantities and costs for construction projects.

  • Identify project scope and specifications.

  • Measure quantities from drawings (e.g., using scale rulers).

  • Use standard methods of measurement (SMM) for consistency.

  • Calculate costs based on material prices and labor rates.

  • Prepare a bill of quantities (BoQ) for tendering.

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked
Q. What is a slump test?
Ans. 

Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.

  • Involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles

  • Helps determine if the concrete mix is suitable for the construction project

  • Results can indicate if more water or additives are needed to adjust the mix

  • Commonly used in constructio...

View all Civil Site Engineer interview questions
Are these interview questions helpful?
A Civil Site Engineer was asked
Q. What is a cube test?
Ans. 

Cube test is a method used to determine the compressive strength of concrete by testing cubes of concrete in a laboratory.

  • Cube test involves casting cubes of concrete and curing them for a specified period of time.

  • The cubes are then tested in a compression testing machine to determine the maximum load they can withstand before failure.

  • The compressive strength of the concrete is calculated based on the maximum load...

View all Civil Site Engineer interview questions
A Civil Site Engineer was asked
Q. Unit wet of 12mm dia of bar
Ans. 

Unit weight of 12mm diameter bar is calculated using the formula: Unit weight = (d^2/162) kg/m, where d is the diameter of the bar in mm.

  • Calculate the cross-sectional area of the bar using the formula: Area = π*(d^2)/4

  • Convert the diameter from mm to m by dividing by 1000

  • Calculate the unit weight using the formula: Unit weight = (Area * length) * density

  • For example, for a 12mm diameter bar with a length of 1m and d...

View all Civil Site Engineer interview questions
A Site Engineer was asked
Q. What is the effective cover for columns, beams, slabs, waist slabs, and footings?
Ans. 

Effective cover in column, beam, slab, waist slab, and footing is the minimum thickness of concrete provided to protect the steel reinforcement from corrosion.

  • Effective cover is determined based on the exposure conditions and the type of structure.

  • For columns and beams, the effective cover is typically 40mm to 50mm.

  • For slabs, the effective cover is typically 20mm to 30mm.

  • For waist slabs, the effective cover is typ...

View all Site Engineer interview questions

Civil Guruji Interview Experiences

5 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I appeared for an interview in May 2025, where I was asked the following questions.

  • Q1. How to calculate BBS
  • Ans. 

    BBS (Bar Bending Schedule) is a detailed list of reinforcement bars required for construction, including their dimensions and quantities.

    • Identify the structural elements (beams, columns, slabs) requiring reinforcement.

    • Calculate the total length of each type of bar needed based on design drawings.

    • Determine the diameter and grade of the bars as specified in the design.

    • List the cut lengths of bars, accounting for bends an...

  • Answered by AI
  • Q2. How to check the concrete material
  • Ans. 

    To check concrete material, assess its quality through tests for strength, workability, and composition.

    • Conduct a slump test to measure workability and consistency of fresh concrete.

    • Perform a compressive strength test using concrete cubes or cylinders after curing.

    • Check for proper grading and cleanliness of aggregates used in the mix.

    • Verify the water-cement ratio to ensure durability and strength.

    • Inspect for any signs ...

  • Answered by AI
  • Q3. Calculate the quantity surveying
  • Ans. 

    Quantity surveying involves estimating material quantities and costs for construction projects.

    • Identify project scope and specifications.

    • Measure quantities from drawings (e.g., using scale rulers).

    • Use standard methods of measurement (SMM) for consistency.

    • Calculate costs based on material prices and labor rates.

    • Prepare a bill of quantities (BoQ) for tendering.

  • Answered by AI
  • Q4. What is survey
  • Ans. 

    Surveying is the science of measuring distances, angles, and elevations to determine land boundaries and create maps.

    • Types of surveys include land surveys, topographic surveys, and construction surveys.

    • Land surveys establish property boundaries, often using tools like theodolites.

    • Topographic surveys map the terrain, showing elevation changes and natural features.

    • Construction surveys ensure that structures are built in ...

  • Answered by AI
  • Q5. Why important know unit conversion
  • Ans. 

    Unit conversion is crucial for accurate measurements, ensuring safety, compliance, and effective communication in engineering projects.

    • Ensures accurate calculations: For example, converting feet to meters for precise structural dimensions.

    • Facilitates compliance with standards: Many engineering codes require specific units, like converting psi to pascals.

    • Enhances communication: Engineers from different regions may use d...

  • Answered by AI
  • Q6. What is center line layout
  • Ans. 

    Center line layout is a method used in construction to establish the precise location of structural elements.

    • It involves marking the center lines of walls, columns, and other structural components on the ground.

    • This layout ensures accurate alignment and spacing of elements during construction.

    • For example, in a building, center lines help in positioning walls relative to each other.

    • It is crucial for maintaining symmetry...

  • Answered by AI
  • Q7. What is process of foundation
  • Ans. 

    The foundation process involves site preparation, excavation, and construction of a stable base for structures.

    • Site Investigation: Assess soil type and load-bearing capacity.

    • Excavation: Digging to the required depth based on design specifications.

    • Foundation Types: Choose between shallow (e.g., spread footings) or deep foundations (e.g., piles) based on soil conditions.

    • Formwork: Construct temporary molds for concrete pl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I hope try to call candidates to more time and get chance next time and find the knowledge in candidates such as any candidate bell feel in estimating,BBS, quantity surveying etc

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 12 Nov 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Coding Test 

Site engineer and billing information

Round 2 - Group Discussion 

Most probably topic Ghutno Les and building construction all detail MBC software I handling total mostly programs excel and MS word

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. What is BBS and one way slab and two way slab
  • Ans. 

    BBS stands for Bar Bending Schedule. One way slab is supported on two opposite sides only, while two way slab is supported on all four sides.

    • BBS is a detailed list of reinforcement bars in a structure

    • One way slab is supported on two opposite sides only

    • Two way slab is supported on all four sides

  • Answered by AI
  • Q2. Unit wet of 12mm dia of bar
  • Ans. 

    Unit weight of 12mm diameter bar is calculated using the formula: Unit weight = (d^2/162) kg/m, where d is the diameter of the bar in mm.

    • Calculate the cross-sectional area of the bar using the formula: Area = π*(d^2)/4

    • Convert the diameter from mm to m by dividing by 1000

    • Calculate the unit weight using the formula: Unit weight = (Area * length) * density

    • For example, for a 12mm diameter bar with a length of 1m and densit...

  • Answered by AI
  • Q3. What is slump test
  • Ans. 

    Slump test is a method to measure the workability of concrete by determining the consistency and stiffness of the mix.

    • Involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles

    • Helps determine if the concrete mix is suitable for the construction project

    • Results can indicate if more water or additives are needed to adjust the mix

    • Commonly used in construction ind...

  • Answered by AI
  • Q4. What is cube test
  • Ans. 

    Cube test is a method used to determine the compressive strength of concrete by testing cubes of concrete in a laboratory.

    • Cube test involves casting cubes of concrete and curing them for a specified period of time.

    • The cubes are then tested in a compression testing machine to determine the maximum load they can withstand before failure.

    • The compressive strength of the concrete is calculated based on the maximum load appl...

  • Answered by AI
  • Q5. Density of steel
  • Ans. 

    Density of steel is approximately 7850 kg/m^3.

    • Density of steel is commonly expressed in kilograms per cubic meter (kg/m^3).

    • The density of steel is approximately 7850 kg/m^3.

    • Density can vary slightly depending on the type of steel and its composition.

  • Answered by AI

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Sep 2022

I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - HR 

(4 Questions)

  • Q1. What's lap length ? What is the length of the bar?
  • Ans. 

    Lap length is the amount of overlap between two reinforcing bars in concrete construction.

    • Lap length is important for ensuring the strength and stability of reinforced concrete structures.

    • It is necessary to provide sufficient lap length to allow for the transfer of stresses between the bars.

    • The length of the lap depends on factors such as the diameter of the bars, the type of structure, and the design requirements.

    • For ...

  • Answered by AI
  • Q2. Which bar is spaced first in two ways slab? And Name the bar in two way slabs?
  • Ans. 

    The first bar to be spaced in two-way slab is the shorter span bar. The bars used in two-way slabs are main bars and distribution bars.

    • The shorter span bar is spaced first in two-way slab

    • Main bars and distribution bars are used in two-way slabs

    • Main bars are placed in both directions and are spaced at closer intervals

    • Distribution bars are placed perpendicular to main bars and are spaced at wider intervals

  • Answered by AI
  • Q3. Lap length is given in how many uppers in the column? What should be the distance of the lap length for the second time?
  • Q4. What is the effective cover in column,beam, slab, waist slab and footing?
  • Ans. 

    Effective cover in column, beam, slab, waist slab, and footing is the minimum thickness of concrete provided to protect the steel reinforcement from corrosion.

    • Effective cover is determined based on the exposure conditions and the type of structure.

    • For columns and beams, the effective cover is typically 40mm to 50mm.

    • For slabs, the effective cover is typically 20mm to 30mm.

    • For waist slabs, the effective cover is typicall...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It will be good for the bbs who will tell the answer

Trainee Interview Questions & Answers

user image Anonymous

posted on 6 Jul 2021

Interview Questionnaire 

2 Questions

  • Q1. For example test pr materials
  • Q2.  Unit weights or baar or cement sand aggregate

Top trending discussions

View All
Interview Tips & Stories
2w
toobluntforu
·
works at
Cvent
Can speak English, can’t deliver in interviews
I feel like I can't speak fluently during interviews. I do know english well and use it daily to communicate, but the moment I'm in an interview, I just get stuck. since it's not my first language, I struggle to express what I actually feel. I know the answer in my head, but I just can’t deliver it properly at that moment. Please guide me
Got a question about Civil Guruji?
Ask anonymously on communities.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. [07/04, 1:22 PM] kamalrAj: Un akka metar video venuma da [07/04, 1:29 PM] kamalrAj: Un akkava poyi kelu daaaa..... [07/04, 1:31 PM] kamalrAj: Un nilamai ninaicha vadivel mosama Irukumula

I applied via Naukri.com and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Contraction lebal questions
  • Q2. Jenral questions
  • Q3. Atitude prasnalty

Interview Preparation Tips

Interview preparation tips for other job seekers - Do your homework
Practice (out loud)
Share your story
Provide Evidence and data
Mirror the interviewers style
Prepare a few questions
Ask if they have any hesitation
Say thanks.
Are these interview questions helpful?

I applied via Campus Placement and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Group Discussion 

General knowledge

Round 2 - Technical 

(2 Questions)

  • Q1. About civil engineering
  • Q2. General knowledge Civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - My self Srikant Mallik
I'm studying BTech engeneering
& Complete my diploma
I'm a good student
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Aptitude n reasoning

Round 2 - Coding Test 

Basic DSA questions, like prime numbers

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. SURVEY, GRADE of concrete
  • Q2. Are U join my company
  • Q3. Yes, I'm interested in your company
  • Q4. I'm join your company
  • Q5. What are you doing now in Tech Mahindra company

Interview Preparation Tips

Topics to prepare for Tech Mahindra Site Engineer interview:
  • Diploma
  • Construction
  • Survey
Interview preparation tips for other job seekers - No share data other company, I'm interested to join your meeting 🤝

Civil Guruji Interview FAQs

How many rounds are there in Civil Guruji interview?
Civil Guruji interview process usually has 1-2 rounds. The most common rounds in the Civil Guruji interview process are HR, Resume Shortlist and One-on-one Round.
How to prepare for Civil Guruji interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Civil Guruji. The most common topics and skills that interviewers at Civil Guruji expect are Adobe Premiere Pro, Aftereffects, Canva, Final Cut Pro and Hiring.
What are the top questions asked in Civil Guruji interview?

Some of the top questions asked at the Civil Guruji interview -

  1. What is the effective cover in column,beam, slab, waist slab and footi...read more
  2. What's lap length ? What is the length of the b...read more
  3. Which bar is spaced first in two ways slab? And Name the bar in two way sla...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.3/5

based on 3 interview experiences

Difficulty level

Easy 100%

Duration

Less than 2 weeks 50%
2-4 weeks 50%
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.6
 • 11.1k Interviews
Accenture Interview Questions
3.7
 • 8.7k Interviews
Infosys Interview Questions
3.6
 • 7.9k Interviews
Wipro Interview Questions
3.7
 • 6.1k Interviews
Cognizant Interview Questions
3.7
 • 5.9k Interviews
Amazon Interview Questions
4.0
 • 5.4k Interviews
Capgemini Interview Questions
3.7
 • 5.1k Interviews
Tech Mahindra Interview Questions
3.5
 • 4.1k Interviews
HCLTech Interview Questions
3.5
 • 4.1k Interviews
Genpact Interview Questions
3.7
 • 3.4k Interviews
View all

Civil Guruji Reviews and Ratings

based on 36 reviews

3.9/5

Rating in categories

4.0

Skill development

3.9

Work-life balance

3.5

Salary

3.6

Job security

3.7

Company culture

3.5

Promotions

3.6

Work satisfaction

Explore 36 Reviews and Ratings
Site Engineer
11 salaries
unlock blur

₹2 L/yr - ₹3 L/yr

Trainee
7 salaries
unlock blur

₹2.4 L/yr - ₹3 L/yr

Engineer Trainee
4 salaries
unlock blur

₹0.4 L/yr - ₹2.5 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹2.5 L/yr

Video Editor
4 salaries
unlock blur

₹1.9 L/yr - ₹3 L/yr

Explore more salaries
Compare Civil Guruji with

TCS

3.6
Compare

Accenture

3.7
Compare

Wipro

3.7
Compare

Cognizant

3.7
Compare
write
Share an Interview