Filter interviews by
The procurement process in SAP involves creating purchase requisitions, purchase orders, goods receipt, and invoice verification.
The process starts with creating a purchase requisition, which is a request for goods or services.
The purchase requisition is then approved by the relevant department or authority.
A purchase order is then created based on the approved purchase requisition.
The purchase order is sent to the ven...
I cannot disclose the exact amount as it varies depending on the company's needs and budget.
The amount of purchase varies depending on the company's needs and budget
I cannot disclose the exact amount due to confidentiality reasons
However, I always ensure that the purchases are made within the allocated budget and with the best possible quality
Creating a purchase order in SAP involves several steps.
Access the ME21N transaction code
Enter the vendor details and material information
Add the required quantity and delivery date
Save the purchase order
Release the purchase order for processing
I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
Describe Full process of Purchasing Raw Materials.
Top trending discussions
posted on 14 Oct 2021
I applied via LinkedIn and was interviewed before Nov 2020. There were 3 interview rounds.
I appeared for an interview in Apr 2024.
I appeared for an interview in Jul 2024.
As a Senior Engineer in the plant, my responsibilities include overseeing operations, managing projects, ensuring compliance with regulations, and leading a team of engineers.
Overseeing day-to-day operations in the plant
Managing projects related to plant upgrades or expansions
Ensuring compliance with safety and environmental regulations
Leading and mentoring a team of engineers
Troubleshooting technical issues and implem
Tan delta testing is conducted in power transformers to assess the insulation condition and detect any potential faults.
Tan delta testing helps in evaluating the insulation quality of power transformers.
It can detect any potential issues such as moisture, contamination, or aging of insulation materials.
By measuring the tan delta value, engineers can assess the dielectric losses in the transformer.
Regular tan delta test...
A vector group is a method used to represent the phase relationship between the primary and secondary windings of a transformer.
Vector group indicates the connection of transformer windings and the phase shift between them.
It is represented by a combination of letters and numbers, such as Yd1, Dyn11, etc.
Different vector groups have different phase relationships, affecting the transformer's performance and operation.
Ve...
Considerations when erecting an IDT (Inverter duty Transformer)
Ensure the transformer is designed for inverter duty applications
Properly size the transformer based on the inverter's output power
Consider the harmonic content of the inverter's output when selecting the transformer
Provide adequate ventilation and cooling for the transformer to handle the increased heat generated by the inverter
Ensure proper grounding and ...
Star-delta connection is a method used in power transformers to reduce starting current and improve efficiency.
Star-delta connection involves connecting the primary windings of the transformer in a star configuration during starting, and then switching to a delta configuration during normal operation.
This method helps in reducing the starting current drawn by the transformer, which is beneficial for the power system.
It...
High-tension (HT) lines use different types of conductors with varying current capacities.
Types of conductors used in HT lines include aluminum, steel, and composite materials
Aluminum conductors are commonly used due to their lightweight and high conductivity
Steel conductors are used for their strength and durability
Composite conductors are a newer technology that offer a balance of strength and conductivity
Current cap...
The distance between poles in 33KV high tension lines is typically around 50-60 meters.
The distance between poles in high tension lines is determined by factors such as terrain, voltage level, and local regulations.
In general, the distance can range from 50 to 60 meters for 33KV high tension lines.
This distance is important to ensure proper support and insulation of the conductors between poles.
The process of laying LT cables involves planning, trenching, laying the cables, jointing, testing, and backfilling.
Plan the route and depth of the trench for laying the cables.
Excavate the trench to the required depth and width.
Lay the cables in the trench, ensuring proper alignment and support.
Joint the cables together using appropriate connectors.
Test the cables for continuity and insulation resistance.
Backfill the ...
The process for attaching modules involves identifying connection points, aligning the modules, securing them in place, and testing for functionality.
Identify connection points on both modules
Align the modules properly to ensure a secure fit
Secure the modules in place using appropriate fasteners or connectors
Test the functionality of the attached modules to ensure proper connection
Seeking new challenges and opportunities for growth in a more innovative environment.
Desire for new challenges and opportunities
Seeking growth and advancement
Looking for a more innovative work environment
I come from a close-knit family of four, including my parents and younger sister.
My parents have always been supportive of my career choices and encouraged me to pursue my passion for engineering.
I have a younger sister who is currently studying computer science at university, following in my footsteps.
We enjoy spending quality time together, whether it's going on family vacations or simply having dinner at home.
I applied via Approached by Company and was interviewed in Jul 2023. There were 3 interview rounds.
posted on 14 Mar 2024
I applied via Approached by Company and was interviewed before Oct 2021. There were 2 interview rounds.
based on 36 reviews
Rating in categories
Senior Officer
12
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Assistant Manager
11
salaries
| ₹3.2 L/yr - ₹5.2 L/yr |
Deputy Manager
10
salaries
| ₹4.5 L/yr - ₹7.8 L/yr |
Service Engineer
9
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Engineer
6
salaries
| ₹1.2 L/yr - ₹2.5 L/yr |
UTL Solar
Danfoss Power Solutions
LM Wind Power
Senvion