Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Centrient Pharmaceuticals Team. If you also belong to the team, you can get access from here

Centrient Pharmaceuticals Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Centrient Pharmaceuticals Maintenance Engineer Interview Questions and Answers

Updated 6 Nov 2019

Centrient Pharmaceuticals Maintenance Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Pharma equipments like Reactors, Centrifuge , vacuum pumps.
  • Q2. Interviewer always ask u why are u looking for job change if u r experienced, be prepare the perfect answer.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was technical one related to pharmaceuticals equipments. It lasted about 40 minutes . Communication skills play a vital role for selection and introduce yourself should be perfect, even during my interview, my introduction was terrific, Engineering head stop me in middle and ask that's ol and ask technical questions, further I answer in a perfect manner for each question. I tell u one thing to ol keep calm during face the interview, no need to worry, Good luck.


Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Maintenance plant operation
  • Q2. Hvac maintenance process
  • Ans. 

    HVAC maintenance process involves regular inspection, cleaning, and repair of heating, ventilation, and air conditioning systems.

    • Regular inspection of HVAC systems to identify any potential issues

    • Cleaning of air filters, ducts, and coils to ensure proper airflow and prevent contamination

    • Repair or replacement of faulty components to maintain system efficiency

    • Testing and balancing of airflows to ensure optimal performanc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Utility maintenance and process maintenance knowledge required.

Interview Questionnaire 

1 Question

  • Q1. What is the difference between MTTR and MTBF?
  • Ans. 

    MTTR is the average time to repair a failed system, while MTBF is the average time between failures.

    • MTTR measures downtime and repair time, while MTBF measures reliability and uptime.

    • MTTR is a measure of how quickly a system can be restored after a failure, while MTBF is a measure of how long a system can operate without failing.

    • MTTR is typically used to evaluate maintenance performance, while MTBF is used to evaluate ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be technically prepared

I applied via Company Website and was interviewed before Jul 2020. There were 4 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Say about your self?
  • Q2. How many types pamps.?
  • Ans. 

    There are several types of pumps used in mechanical engineering.

    • Centrifugal pumps

    • Reciprocating pumps

    • Rotary pumps

    • Diaphragm pumps

    • Gear pumps

    • Vane pumps

    • Screw pumps

    • Jet pumps

    • Peristaltic pumps

    • Piston pumps

  • Answered by AI
  • Q3. Say the parts of pump
  • Ans. 

    The parts of a pump include impeller, casing, shaft, bearings, seals, and motor.

    • Impeller: Rotating component that imparts energy to the fluid.

    • Casing: Encloses the impeller and directs the flow of fluid.

    • Shaft: Transmits the rotational motion from the motor to the impeller.

    • Bearings: Support the shaft and reduce friction.

    • Seals: Prevent leakage of fluid along the shaft.

    • Motor: Provides the power to drive the pump.

  • Answered by AI
  • Q4. About salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Ya it's good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What was role in company
  • Ans. 

    I was responsible for designing and testing mechanical components for various projects.

    • Designed mechanical components for new products

    • Conducted testing and analysis to ensure functionality and safety

    • Collaborated with other engineers and departments to meet project goals

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Basic technical questions
  • Q2. Detailed technical questions
  • Q3. Family background & related
Round 3 - HR 

(1 Question)

  • Q1. Salary discussions and negotiations

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing much as routine questioning is there.

I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1)What is m25 ratio.? 2) what is steel density? 3) How to calculate steel weight? 4) What is plastering ratio? 5)How many bricks are in 1 cubic meters?
  • Ans. 

    Answers to questions related to construction and engineering.

    • 1) M25 ratio is a mix design ratio used in concrete construction.

    • 2) Steel density is the mass per unit volume of steel.

    • 3) Steel weight can be calculated by multiplying the volume of steel by its density.

    • 4) Plastering ratio refers to the proportion of cement and sand used in plastering.

    • 5) The number of bricks in 1 cubic meter depends on the size of the bricks.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Feel free and listen questions care fully
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Are you working any work location hyderabad or vizag?

I was interviewed in Dec 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. They ask me what are major problems of all analytical instruments in lab and how to diagnose the problem to resolve
  • Q2. There is so many questions I have faced on that interview

Interview Preparation Tips

Topics to prepare for Aurobindo Pharma Service Engineer interview:
  • HPLC
Interview preparation tips for other job seekers - You should maintain hygiene and speak proper English and give suitable answers for what they asked

I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(6 Questions)

  • Q1. What is last company
  • Q2. What is last designe in plant
  • Ans. 

    I'm sorry, I cannot answer this question as I do not have access to the plant's design records.

    • No access to plant's design records

    • Cannot provide information on last design

    • Need more information to answer question

  • Answered by AI
  • Q3. What your total experience in water treatment plant
  • Q4. Why last job region .
  • Q5. Your corunt company in water treatment plant, ETP plant stp plant softener plant zld
  • Q6. What is your education ..

Interview Preparation Tips

Topics to prepare for Lupin Shift Engineer interview:
  • Msc chemistry
Interview preparation tips for other job seekers - how to make sure you Happy you in interested in water fild.
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

PHOTOS

Medanta the Medicity

4 office photos

INTERVIEWS

Centrient Pharmaceuticals

No Interviews

INTERVIEWS

Centrient Pharmaceuticals

No Interviews

INTERVIEWS

Apotex Research

No Interviews

INTERVIEWS

Centrient Pharmaceuticals

No Interviews

JOBS

NTT DATA, Inc.

No Jobs

REVIEWS

NTT DATA, Inc.

No Reviews

REVIEWS

NTT DATA, Inc.

No Reviews

INTERVIEWS

Centrient Pharmaceuticals

No Interviews

INTERVIEWS

Centrient Pharmaceuticals

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

Cipla Interview Questions
4.1
 • 481 Interviews
Lupin Interview Questions
4.2
 • 335 Interviews
Aurobindo Pharma Interview Questions
4.0
 • 238 Interviews
Biocon Limited Interview Questions
3.9
 • 152 Interviews
Apotex Research Interview Questions
4.1
 • 29 Interviews
View all
Centrient Pharmaceuticals Maintenance Engineer Salary
based on 4 salaries
₹3 L/yr - ₹4.2 L/yr
11% less than the average Maintenance Engineer Salary in India
View more details
Senior Executive
35 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Officer
31 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive
28 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
25 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Supervisor
22 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Centrient Pharmaceuticals with

Sun Pharmaceutical Industries

4.0
Compare

Cipla

4.1
Compare

DRJ & CO

5.0
Compare

Biocon Limited

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent