Filter interviews by
I applied via Walk-in and was interviewed before Jul 2021. There were 3 interview rounds.
A boiler is a closed vessel used to generate steam. A cooling tower is a heat rejection device. A pump is a device used to move fluids.
Boiler is used to generate steam by heating water.
Cooling tower is used to reject heat from a process.
Pump is used to move fluids from one place to another.
Types of pump include centrifugal, positive displacement, and axial flow pumps.
Top trending discussions
I appeared for an interview before Dec 2020.
posted on 19 Feb 2025
I appeared for an interview before Feb 2024.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.
posted on 26 Apr 2021
I appeared for an interview in Jun 2017.
I applied via Recruitment Consulltant and was interviewed before Jun 2022. There were 5 interview rounds.
Basic questions with respect to your role
Checkpoints during breakdown
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
I applied via Newspaper Ad and was interviewed before May 2023. There were 2 interview rounds.
Medium to easy questions
Two questions on arrays easy to moderate
based on 1 review
Rating in categories
Production Officer
174
salaries
| ₹1 L/yr - ₹3.8 L/yr |
QC Officer
91
salaries
| ₹1.3 L/yr - ₹3 L/yr |
QC Chemist
60
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Maintenance Engineer
53
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Quality Control Officer
52
salaries
| ₹1.4 L/yr - ₹2.5 L/yr |
Cipla
Dr. Reddy's
Lupin
Zydus Lifesciences