Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by CDM Smith Team. If you also belong to the team, you can get access from here

CDM Smith Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

CDM Smith Engineering Student Interview Questions and Answers

Updated 22 Aug 2023

CDM Smith Engineering Student Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are the main unit processes involved in water treatment?
  • Ans. 

    Main unit processes in water treatment include coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation: Chemicals are added to water to destabilize particles and allow them to clump together.

    • Flocculation: Gentle mixing to encourage the particles to form larger flocs.

    • Sedimentation: Flocs settle to the bottom of a tank due to gravity.

    • Filtration: Water passes through filters to remove remaining ...

  • Answered by AI
  • Q2. Name some advanced water treatment processes.
  • Ans. 

    Some advanced water treatment processes include reverse osmosis, UV disinfection, and advanced oxidation.

    • Reverse osmosis: uses a semi-permeable membrane to remove ions, molecules, and larger particles from water.

    • UV disinfection: uses ultraviolet light to kill bacteria, viruses, and other microorganisms in water.

    • Advanced oxidation: uses powerful oxidants like ozone or hydrogen peroxide to break down organic and inorgani

  • Answered by AI

Interview Preparation Tips

Topics to prepare for CDM Smith Engineering Student interview:
  • Wastewater treatment
  • Water Treatment
  • Advanced water treatment
Interview preparation tips for other job seekers - Learn A to Z of water and wastewater engineering. Even advanced treatment processes are important.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Basics related to piperack design
  • Q2. Design parameters for steel structure
  • Ans. 

    Design parameters for steel structure

    • Load capacity and distribution

    • Material strength and durability

    • Environmental factors such as wind and seismic activity

    • Connection details and joint design

    • Fire resistance and protection measures

  • Answered by AI
  • Q3. Number of years exposure to staad
  • Ans. 

    I have 5 years of exposure to STAAD software.

    • I have used STAAD for various structural analysis and design projects.

    • I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.

    • I have experience in using STAAD for seismic analysis and design of structures.

    • I have also used STAAD for foundation design and analysis.

    • I keep myself updated with the latest versions and features of STAAD so

  • Answered by AI
  • Q4. Grating design and deflection limits

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive & confident

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About the technologies mentioned in the resume
  • Q2. SQL, Python, Power BI , Shell

Interview Preparation Tips

Interview preparation tips for other job seekers - Please be prepared for the technologies mentioned in your resume
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Prepare basics properly before going for interview, they mostly ask less questions with more depth.
  • Q2. Draw BMD for sway frame.
  • Ans. 

    BMD for sway frame is a diagram showing the variation of bending moment along the length of the frame.

    • BMD for sway frame will have a shape similar to a zigzag pattern due to the presence of sway in the frame.

    • The bending moment will be maximum at the points where the frame experiences maximum sway.

    • The BMD can be drawn by analyzing the internal forces and moments acting on the frame.

  • Answered by AI
Round 3 - One-on-one 

(3 Questions)

  • Q1. Draw piperack elevations
  • Ans. 

    Drawing piperack elevations involves creating detailed drawings of the structure from different viewpoints.

    • Start by determining the dimensions and layout of the piperack

    • Use software like AutoCAD to create accurate and detailed drawings

    • Include all necessary details such as pipe sizes, supports, and connections

    • Label all components clearly for easy understanding

    • Review and revise the drawings as needed for accuracy

  • Answered by AI
  • Q2. Anchor bolt design
  • Q3. Base plate design
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Which column takes more load short or Long Column
  • Q2. What kind of pressures will impose on the water tank walls during seismic

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with fundamentals
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. 1. Diff. Type Flow Meter Concept 2. Temperature Compensation in thermocouple 3. SPI modules 4. Level Mesurment
Round 3 - HR 

(1 Question)

  • Q1. Personal Questions about salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Basics about things worked should be clear and prepared before interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Achievements, Experience, Projects Handled
  • Q2. Project work executed in last few years
  • Ans. 

    I have executed multiple projects in the last few years.

    • Developed a new website for a client using HTML, CSS, and JavaScript.

    • Created a mobile application for a startup using React Native.

    • Managed a team of developers to build a custom CRM system for a large corporation.

    • Implemented a data analytics solution for a healthcare organization using Python and SQL.

    • Designed and executed a social media marketing campaign for a no

  • Answered by AI

Consultant Interview Questions & Answers

AECOM user image All job update And class

posted on 10 Sep 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

3 candidate was their vs 1 opening

Round 3 - One-on-one 

(1 Question)

  • Q1. There was a senior Social scientist, have taken interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is minimum gap between two structures for seismic point of view
  • Ans. 

    Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.

    • Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.

    • This gap helps prevent collision or structural damage during an earthquake.

    • Building codes and regulations may specify minimum gaps for seismic safety.

    • Example: If one building is 100 feet tall, the m...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read all codes well

CDM Smith Interview FAQs

How many rounds are there in CDM Smith Engineering Student interview?
CDM Smith interview process usually has 2 rounds. The most common rounds in the CDM Smith interview process are Technical and Resume Shortlist.
What are the top questions asked in CDM Smith Engineering Student interview?

Some of the top questions asked at the CDM Smith Engineering Student interview -

  1. What are the main unit processes involved in water treatme...read more
  2. Name some advanced water treatment process...read more

Tell us how to improve this page.

CDM Smith Engineering Student Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 87 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Saipem Interview Questions
4.2
 • 46 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
Ramboll Interview Questions
4.1
 • 37 Interviews
View all
Project Control Specialist
27 salaries
unlock blur

₹6 L/yr - ₹17.5 L/yr

BIM Modeller
26 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Accountant
24 salaries
unlock blur

₹10.5 L/yr - ₹24.9 L/yr

GIS Specialist
18 salaries
unlock blur

₹3.4 L/yr - ₹11 L/yr

Structural Engineer
11 salaries
unlock blur

₹6 L/yr - ₹10.5 L/yr

Explore more salaries
Compare CDM Smith with

AECOM

4.2
Compare

AtkinsRealis

3.9
Compare

Saipem

4.2
Compare

Nasser S. Al Hajri Corporation

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview