There is no neutral in a DG (Diesel Generator) because it operates on a single-phase system.
DGs are typically single-phase systems, meaning they do not have a neutral wire.
The output of a DG is usually two wires - one phase and one ground.
In contrast, a three-phase system would have three phases and a neutral wire.
The absence of a neutral in a DG simplifies the wiring and operation of the generator.
Transformer protections include overcurrent, overvoltage, differential, and earth fault protection. Antipumping system prevents multiple closing of the circuit breaker.
Transformer protections are necessary to prevent damage to the transformer and ensure safety.
Overcurrent protection is used to protect the transformer from excessive current flow.
Overvoltage protection is used to protect the transformer from excessive vo...
posted on 8 Apr 2024
I applied via Referral and was interviewed in Mar 2024. There were 3 interview rounds.
HVAC stands for Heating, Ventilation, and Air Conditioning system which is responsible for providing thermal comfort and acceptable indoor air quality.
HVAC system controls the temperature, humidity, and air quality in a building or vehicle.
It includes components such as furnaces, air conditioners, heat pumps, ductwork, and thermostats.
HVAC systems can be centralized or decentralized depending on the size and layout of ...
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
Transformers work by converting electrical energy from one circuit to another through electromagnetic induction.
Transformers have two coils of wire, a primary coil and a secondary coil.
The primary coil is connected to a power source and produces a magnetic field when current flows through it.
The magnetic field induces a voltage in the secondary coil, which is connected to the load.
The voltage in the secondary coil is p...
There can be multiple causes for an alternator to not start.
Dead battery
Faulty alternator
Broken or loose belts
Faulty voltage regulator
Bad wiring or connections
I was interviewed before Feb 2021.
I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.
Discuss about Hike on Delhi Metro fare price hike
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
I applied via Referral and was interviewed in Mar 2022. There were 2 interview rounds.
based on 2 reviews
Rating in categories
Assistant Manager
1.6k
salaries
| ₹3.5 L/yr - ₹10.5 L/yr |
Facility Executive
670
salaries
| ₹2.2 L/yr - ₹6.6 L/yr |
Deputy Manager
552
salaries
| ₹4 L/yr - ₹13 L/yr |
Assistant Facility Manager
518
salaries
| ₹3.5 L/yr - ₹10.2 L/yr |
Facility Manager
479
salaries
| ₹4 L/yr - ₹15 L/yr |
JLL
Colliers India
Knight Frank
Cushman & Wakefield