QA/QC of hydrocarbon's pipeline construction involves ensuring compliance with industry standards and regulations.
Performing inspections and tests on materials used in construction
Monitoring welding processes to ensure quality and integrity of welds
Conducting pressure tests to check for leaks and structural integrity
Documenting all QA/QC activities and maintaining records for future reference
Inspection involves thorough examination and evaluation of products or processes to ensure they meet quality standards.
Develop a detailed inspection plan outlining what needs to be inspected and how
Use appropriate tools and techniques to conduct inspections
Document findings and communicate any issues or defects to relevant stakeholders
Follow up on corrective actions to ensure issues are resolved
Regularly review and upd...
The best cleaning methods for pipelines after construction include pigging, chemical cleaning, and water flushing.
Pigging involves using a device called a 'pig' to remove debris and buildup from the pipeline.
Chemical cleaning uses specialized chemicals to dissolve and remove contaminants from the pipeline walls.
Water flushing involves flushing the pipeline with water at high pressure to remove any remaining debris or c
Impressed Current Cathodic Protection system is better for Road / Railway crossings.
Impressed Current Cathodic Protection system is more effective in providing continuous protection compared to Galvanic Cathodic Protection system.
Impressed Current system allows for adjustment of current output to suit changing conditions.
Regular monitoring and maintenance is required for Impressed Current system to ensure optimal perfo...
Top trending discussions
posted on 12 Oct 2024
I applied via campus placement at PSG College of Technology, Coimbatore and was interviewed in Sep 2024. There were 3 interview rounds.
General knowlegde, Basic Aptitude, Domain Technical MCQ
Genx vs Genz, Altitude and comparsion
Components of a transformer include core, windings, and insulation.
Core: Provides a path for magnetic flux
Windings: Primary and secondary coils for inducing voltage
Insulation: Prevents short circuits and ensures safety
posted on 2 Dec 2024
I applied via Referral and was interviewed in Jun 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
The three main things in a hydrotest test pack are pressure gauges, test pumps, and test plugs.
Pressure gauges are used to measure the pressure during the hydrotest.
Test pumps are used to generate the required pressure for the test.
Test plugs are used to seal off the openings in the system being tested.
Cement coating standards ensure the quality and durability of cross country pipelines.
Cement coating standards specify the thickness and composition of the coating.
Standards also define the application and curing processes for the coating.
Coating standards ensure protection against corrosion and mechanical damage.
Examples of cement coating standards include API RP 5L2 and ISO 21809-1.
I applied via campus placement at Netaji Subhas Institute of Technology (NSIT)
Electromagnetic flowmeter measures flow rate by using Faraday's law of electromagnetic induction.
Electromagnetic flowmeter is based on the principle of Faraday's law of electromagnetic induction.
It consists of a flow tube, electrodes, and a magnetic field.
When a conductive fluid flows through the flow tube, it generates a voltage proportional to the flow rate.
The electrodes detect the voltage and the magnetic field ens...
Interacting systems have feedback loops and can influence each other's behavior, while non-interacting systems operate independently.
Interacting systems have mutual dependencies and can affect each other's inputs, outputs, or behavior.
Non-interacting systems operate independently and do not have any influence on each other.
Interacting systems often involve feedback loops where the output of one system affects the input...
Materials are stored in designated areas based on type and requirements.
Materials are stored in designated areas based on type and requirements
Proper labeling and organization is maintained to ensure easy access and inventory control
Temperature and humidity control may be necessary for certain materials
Regular inspections and audits are conducted to ensure compliance with storage guidelines
Yes, I have extensive experience working in civil infrastructure.
Managed QA/QC processes for various civil infrastructure projects
Ensured compliance with industry standards and regulations
Implemented quality control measures to improve project outcomes
Collaborated with engineers and contractors to address quality issues
Performed inspections and audits to verify quality of work
Examples: oversaw construction of bridges,
It was based on round 1,similar questions were asked, but client ask me about manufacturing process and i told to the Aramco that, i don't have experience in manufacturing, i got only experience in Construction site, but client Aramco told me your based on your site experience, we need your inputs in manufacturing
DOL (Direct-On-Line) and star delta are two different wiring schemes used in electrical engineering for starting induction motors.
DOL wiring directly connects the motor to the power supply for starting, while star delta wiring initially starts the motor in star configuration and then switches to delta configuration for running.
DOL wiring is simpler and cheaper but causes high starting current, while star delta wiring r...
posted on 26 Mar 2024
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Different types of level instruments can be used in different applications depending on the requirements.
For continuous level measurement, ultrasonic level sensors can be used.
For point level detection, capacitance level switches can be used.
For high-temperature applications, guided wave radar level sensors can be used.
For corrosive or aggressive liquids, magnetic level gauges can be used.
For level measurement in open
Interview experience
Graduate Engineer Trainee (Get)
21
salaries
| ₹8 L/yr - ₹15 L/yr |
Production Engineer
6
salaries
| ₹7 L/yr - ₹19 L/yr |
Electrical GET
5
salaries
| ₹10 L/yr - ₹18.5 L/yr |
Lab Technician
5
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Environment Health and Safety Officer
4
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Reliance Industries
Oil And Natural Gas Corporation
Indian Oil Corporation
Bharat Petroleum