Filter interviews by
I applied via Recruitment Consulltant
Do not remember the questions now.
I applied via Campus Placement and was interviewed in Sep 2023. There were 3 interview rounds.
90 mins , 3 coding questions
I applied via LinkedIn and was interviewed in Oct 2024. There was 1 interview round.
Psychometric test, 5 mins
I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.
posted on 21 Nov 2024
I applied via Naukri.com and was interviewed before Dec 2022. There were 4 interview rounds.
The notice period is the time between resigning from a job and the last working day.
Notice period is typically stated in the employment contract.
It is important to adhere to the notice period to ensure a smooth transition.
Last working day is usually the final day of employment after serving the notice period.
I applied via Walk-in and was interviewed in Jun 2022. There were 4 interview rounds.
MCO questions type test
posted on 6 Jul 2023
I applied via LinkedIn and was interviewed in Jun 2023. There were 3 interview rounds.
They send you a link to take an aptitude test.. after that they will send you your result.
Ther were 3 other after behavior test , there were 3 games .. math, puzzle and a memory test game
posted on 4 Dec 2023
I applied via Referral and was interviewed in Sep 2023. There were 5 interview rounds.
Aptitude questions/English test
I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.
The quantity of steel in overhead tanks varies based on their capacities.
The quantity of steel required for an overhead tank depends on the size and shape of the tank.
Calculations involve determining the surface area of the tank walls and base, and the thickness of the steel used.
Different capacities of overhead tanks will require different amounts of steel.
For example, a 1000 liter tank will require less steel compare
The time it takes to finish an overhead tank depends on various factors such as size, materials used, labor availability, and weather conditions.
Factors affecting the time to finish an overhead tank include size of the tank, materials used, labor availability, and weather conditions.
For example, a small overhead tank made of concrete may take a few days to finish, while a larger tank made of steel could take weeks.
Effi...
Hydro pressure testing of a line involves filling the line with water and pressurizing it to check for leaks or weaknesses.
Fill the line with water to the required pressure level
Monitor the pressure for a specified duration to ensure it remains stable
Inspect the line for any leaks or weaknesses
Release the pressure and drain the water from the line after testing
Document the results and any necessary repairs or maintenan
High Density Polyethylene pipe
HDPE stands for High Density Polyethylene
HDPE pipes are commonly used in water supply, drainage, and gas distribution systems
They are known for their durability, flexibility, and resistance to corrosion
HDPE pipes are lightweight and easy to install, making them a popular choice in construction projects
Vendor development of execution work involves building relationships with vendors to ensure successful completion of project tasks.
Identify potential vendors who can provide the required services or products
Negotiate contracts and agreements with vendors to establish terms and conditions
Monitor vendor performance to ensure they meet project requirements and deadlines
Provide feedback to vendors to improve their performa...
Managed multiple projects simultaneously, overseeing timelines, budgets, and resources.
Led cross-functional teams to ensure project goals were met
Developed project plans and schedules
Monitored project progress and reported updates to stakeholders
Identified and resolved project issues and risks
Managed project budgets and resources effectively
I have researched the average salary range for Project Managers in this industry and location.
Researched average salary range for Project Managers in industry and location
Considered my experience, skills, and qualifications when determining salary expectations
Open to negotiation based on benefits package and growth opportunities
based on 1 interview
Interview experience
based on 11 reviews
Rating in categories
Associate
284
salaries
| ₹1.8 L/yr - ₹7 L/yr |
Associate Engineer
283
salaries
| ₹3 L/yr - ₹6 L/yr |
Project Manager
261
salaries
| ₹7 L/yr - ₹30 L/yr |
Service Reliability Engineer
206
salaries
| ₹3 L/yr - ₹10 L/yr |
Financial Analyst
202
salaries
| ₹7.4 L/yr - ₹23 L/yr |
Sterlite Technologies
Indus Towers
Cisco
Lumen Technologies