i
Brakes India
Filter interviews by
I applied via AmbitionBox and was interviewed in Jan 2023. There were 2 interview rounds.
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 19 Jan 2021
I appeared for an interview in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
I applied via Walk-in and was interviewed before Jul 2020. There was 1 interview round.
Maintenance is the process of ensuring that equipment, machinery, and facilities are in good working condition.
Regular inspection and repair of equipment
Preventive maintenance to avoid breakdowns
Replacing worn-out parts
Cleaning and lubricating machinery
Ensuring safety standards are met
Maintaining records of maintenance activities
Responding to emergency repairs
Continuous improvement of maintenance processes
PM stands for Preventive Maintenance, MTTR is Mean Time To Repair, and MTBF is Mean Time Between Failures.
PM is a proactive maintenance strategy that involves regularly scheduled maintenance to prevent equipment failure.
MTTR is the average time it takes to repair a piece of equipment after a failure.
MTBF is the average time between equipment failures.
These metrics are important for measuring the effectiveness of mainte...
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
I applied via Job Portal
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
Discuss all topics of electrical and electronics and all over skills
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Trainee
269
salaries
| ₹0.9 L/yr - ₹3.1 L/yr |
Engineer
222
salaries
| ₹3.2 L/yr - ₹8.6 L/yr |
Junior Engineer
221
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Senior Engineer
173
salaries
| ₹5.6 L/yr - ₹12.4 L/yr |
Deputy Engineer
143
salaries
| ₹3.2 L/yr - ₹7.7 L/yr |
Bosch
Samvardhana Motherson Group
MRF Tyres
UNO Minda