i
Brakes India
Filter interviews by
Top trending discussions
I was interviewed before Sep 2016.
Qualification refers to the skills, knowledge, experience, or credentials that make an individual suitable for a particular job or task.
Qualifications can include educational degrees, certifications, licenses, and relevant work experience.
They demonstrate a person's ability to perform specific tasks or roles effectively.
Employers often list qualifications as requirements in job postings to ensure candidates meet the ne...
Yes, I have 3 years of experience working in the automobile industry.
Worked as a sales representative for a car dealership
Managed inventory and conducted vehicle inspections
Assisted in organizing promotional events and test drives
I applied via Referral and was interviewed before Jan 2020. There were 4 interview rounds.
Processes required in any project include planning, execution, monitoring, and closing.
Planning involves defining project goals, scope, and resources.
Execution involves carrying out the plan and completing project tasks.
Monitoring involves tracking progress and making adjustments as needed.
Closing involves wrapping up the project and evaluating its success.
Examples of project processes include risk management, quality
Points to check in an invoice before processing
Check for accuracy of billing information
Verify the amount charged and ensure it matches the agreed upon price
Ensure all necessary supporting documents are attached
Check for any discounts or promotions that may apply
Verify the payment terms and due date
Ensure the invoice is addressed to the correct recipient
Check for any errors or discrepancies
I applied via Company Website and was interviewed before Nov 2020. There were 4 interview rounds.
I applied via Referral and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
First off all, we ought to have some sortoff automobile and production knowledge because they will definitely check our technical skill secondly, listening skill and fluency plays significant factor
TQBM stands for 'Tudo Que Bem' which means 'Everything is fine' in Portuguese. BOM means 'good' in Portuguese.
TQBM is a common phrase used in Brazil to ask if everything is okay.
BOM is often used as a response to TQBM to indicate that everything is good.
Both TQBM and BOM are informal and commonly used in everyday conversations.
Example: A friend asks 'TQBM?' and you respond 'BOM, e voce?' which means 'Everything is fine
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 3 interview rounds.
A relay holding circuit diagram is used to keep the relay in the energized state even after the control signal is removed.
The circuit typically includes a holding contact that maintains the relay coil energized.
A latching relay can also be used for holding without continuous power supply.
Examples: ladder logic diagram with a holding contact, latching relay circuit diagram.
PNP and NPN are types of bipolar junction transistors commonly used in electronic circuits.
PNP transistor has a layer of N-type semiconductor between two layers of P-type semiconductor, while NPN transistor has a layer of P-type semiconductor between two layers of N-type semiconductor.
In a PNP transistor, current flows from the emitter to the base and then to the collector, while in an NPN transistor, current flows fro...
There are various types of sensors used for different purposes.
Temperature sensors (e.g. thermocouples, thermistors)
Pressure sensors (e.g. piezoelectric sensors)
Motion sensors (e.g. accelerometers, gyroscopes)
Proximity sensors (e.g. ultrasonic sensors)
Light sensors (e.g. photodiodes, phototransistors)
PLC stands for Programmable Logic Controller, which is a digital computer used for automation of electromechanical processes.
PLC is used to control machinery in manufacturing processes, such as assembly lines, robotic devices, or any activity that requires high reliability control.
It is programmed using a specialized computer language, typically ladder logic or function block diagram.
PLCs are commonly used in industrie...
I applied via Company Website
TTR stands for Total Thickness Range and is required for powder coating process to ensure proper adhesion and durability.
TTR is the range of thickness of the substrate and any coatings applied to it
It is important for powder coating as it ensures proper adhesion and durability
If the TTR is too large, the coating may not adhere properly or may crack and peel over time
Examples of substrates with varying TTR include alumi
Detection and prevention poka-yoke refers to the use of techniques to identify and prevent errors in a process.
Poka-yoke is a Japanese term for mistake-proofing
Detection poka-yoke involves identifying errors as they occur
Prevention poka-yoke involves designing processes to prevent errors from occurring
Examples of poka-yoke include using checklists, color-coding, and physical barriers
Poka-yoke can improve quality, reduc
Decrease in pH can occur due to various factors in conversion coating.
Decrease in pH can be caused by the addition of an acid or acidic solution.
Presence of reactive metals in the coating can lead to a decrease in pH.
Contamination by organic materials or impurities can also lower the pH.
Chemical reactions during the conversion coating process may result in pH decrease.
Examples of conversion coatings include phosphating
To prepare 0.1 N H2SO4 & NaOH, calculate the required amount of solute and dissolve it in distilled water.
Calculate the molar mass of H2SO4 and NaOH
Determine the required amount of solute using the formula: N = (W/M) x (1000/V)
Dissolve the calculated amount of solute in distilled water to make 1 liter of solution
Standardize the solution using a primary standard
Use a burette to measure the volume of solution needed for
To cross verify 0.1 normality H2SO4, use a standard solution of NaOH and an indicator.
Prepare a standard solution of NaOH of known concentration.
Add a few drops of an indicator such as phenolphthalein to the H2SO4 solution.
Titrate the H2SO4 solution with the NaOH solution until the endpoint is reached.
The endpoint is when the indicator changes color, indicating that all the H2SO4 has reacted with the NaOH.
Calculate the...
Prepare a pH buffer solution as per defined standard in tablet.
Determine the required pH value and buffer capacity
Select the appropriate buffer system and calculate the required amounts of buffer components
Dissolve the buffer components in water and adjust the pH as necessary
Check the pH and adjust if necessary
Filter the solution and store in a clean container
Use a calibrated pH meter to verify the pH of the solution
based on 3 reviews
Rating in categories
Trainee
275
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
204
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
167
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Engineer
150
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
TVS Motor
Mahindra & Mahindra
Tata Motors