Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed before Feb 2022. There were 4 interview rounds.
Focused mainly on basic aptitude and core mechanical engineering
A case study was given on a live business case. Keep the discussion lively and present your points with confidence.
The rpm of a turbocharger varies depending on the make and model.
The rpm of a turbocharger can range from 50,000 to 200,000.
The rpm is determined by the size and design of the turbocharger.
Higher rpm means more air is forced into the engine, increasing power output.
Turbochargers in diesel engines typically have lower rpm than those in gasoline engines.
The rpm can be controlled by the wastegate or variable geometry turb
I would try to remain calm and comply with their demands while also seeking assistance from local authorities.
Remain calm and avoid any confrontational behavior
Comply with their demands to avoid any harm
Try to gather as much information as possible about the officer and the situation
Seek assistance from local authorities as soon as possible
Document the incident and report it to the appropriate authorities
Value stream mapping is a lean management tool used to analyze and improve the flow of materials and information in a plant.
It helps identify waste and inefficiencies in the production process
It involves mapping out the entire production process from start to finish
It helps in identifying bottlenecks and areas for improvement
It can be used to optimize the production process and reduce lead times
Example: A value stream ...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2017. There were 8 interview rounds.
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
Intercompany refers to transactions that occur between two or more entities within the same company or corporate group.
Intercompany transactions are common in multinational corporations to transfer goods, services, or funds between subsidiaries.
These transactions must be recorded accurately to ensure proper financial reporting and compliance with tax regulations.
Intercompany eliminations are necessary to avoid double c...
Variances in Intercompany reconciliation can arise due to differences in accounting methods, timing of transactions, currency exchange rates, and intercompany agreements.
Differences in accounting methods used by different entities within the same company
Timing discrepancies in recording transactions between intercompany entities
Currency exchange rate fluctuations affecting the value of intercompany transactions
Lack of ...
Purchase and sale JE refers to the journal entries made to record the purchase and sale of goods or services in a business.
Purchase JE records the purchase of goods or services, typically debiting an inventory account and crediting accounts payable.
Sale JE records the sale of goods or services, typically debiting accounts receivable and crediting sales revenue.
These journal entries are essential for accurately tracking...
Yes, stock in transit is recorded in the balance sheet.
Stock in transit is considered as part of inventory and is recorded in the balance sheet under current assets.
It represents goods that have been shipped but have not yet reached their final destination.
The value of stock in transit is included in the total inventory value on the balance sheet.
I have worked with SAP ERP in my previous role as Assistant Manager.
Implemented SAP ERP system to streamline business processes
Trained team members on how to use SAP ERP for inventory management
Generated reports and analyzed data using SAP ERP
Collaborated with IT department to customize SAP ERP to meet specific business needs
I applied via Referral and was interviewed before Dec 2023. There were 3 interview rounds.
It was easy one and the questions were related to AR
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I have handled three types of chillers: Screw, Centrifugal, and Scroll.
I have experience working with Screw, Centrifugal, and Scroll chillers.
I am familiar with the maintenance and operation of these types of chillers.
For example, I have worked with a 200-ton Centrifugal chiller at my previous job.
Surge in centrifugal chiller is a condition where the flow of refrigerant is disrupted, causing a drop in pressure and flow rate.
Surge can occur when the chiller is operating at low load or when there is a sudden change in load.
It can cause damage to the compressor and other components of the chiller.
Surge can be prevented by using surge control devices such as inlet guide vanes, variable speed drives, and surge tanks.
...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
The steps of contract creation involve offer, acceptance, consideration, and mutual agreement.
Offer: One party proposes terms to another party.
Acceptance: The other party agrees to the terms proposed.
Consideration: Both parties exchange something of value.
Mutual agreement: Both parties come to a meeting of the minds.
Drafting: The contract is written and reviewed by both parties.
Execution: Both parties sign the contract...
based on 2 interviews
Interview experience
based on 12 reviews
Rating in categories
Senior Engineer
849
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
795
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
658
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
507
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
491
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
ABB
Schneider Electric
Honeywell Automation