Filter interviews by
I applied via Walk-in and was interviewed in Aug 2020. There were 3 interview rounds.
Bachelor's degree in Business Administration
Bachelor's degree in Business Administration
Graduated from XYZ University in 2018
Specialized in Marketing and Management
I have 2 years of experience working in the marketing field, where I managed social media campaigns and conducted market research.
Managed social media campaigns
Conducted market research
Worked in the marketing field for 2 years
I applied via Walk-in and was interviewed before Dec 2021. There was 1 interview round.
Supply chain management is the coordination and management of activities involved in the production and delivery of products and services.
It involves the planning, sourcing, manufacturing, and delivery of products or services
It aims to optimize the flow of goods and services from the supplier to the customer
It involves managing relationships with suppliers and customers
It includes inventory management, transportation, ...
ABS stands for Acrylonitrile Butadiene Styrene, a common thermoplastic polymer used in various industries.
ABS is a lightweight and durable material.
It is commonly used in the production of automotive parts, toys, and electronic housings.
ABS is resistant to impact, heat, and chemicals.
It can be easily molded and extruded into various shapes and sizes.
ABS is also used in 3D printing as a popular filament material.
Yes, SAP/ERP is an enterprise resource planning software used for managing business operations.
SAP stands for Systems, Applications, and Products in Data Processing
ERP is a software that integrates all departments and functions across a company
It helps in streamlining business processes and improving efficiency
Examples of SAP/ERP modules include finance, sales, inventory, and production
It is widely used in industries s
I applied via Campus Placement and was interviewed in May 2020. There were 4 interview rounds.
Lean Six Sigma involves a structured approach to process improvement by reducing waste and variability.
Define the problem and set goals
Measure current performance and collect data
Analyze the data to identify root causes
Improve the process by implementing solutions
Control the process to sustain improvements
Use tools such as process mapping, statistical analysis, and DMAIC methodology
Examples include reducing defects in ...
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and optimizing workflow.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and inspect the work area regularly
Standardize - establish procedures and guidelines for maintaining the 5S system
Sustain - ensure that the 5S system i...
Bosch Chassis Systems interview questions for popular designations
I applied via Walk-in and was interviewed before Oct 2020. There were 6 interview rounds.
TPM, KAIZEN, POKA YOKE, LINE BALANCING, OEE, CYCLE TIME, TKT TIME are all manufacturing terms related to process improvement and efficiency.
TPM - Total Productive Maintenance, a system for maintaining and improving equipment and processes
KAIZEN - Continuous improvement, a philosophy of making small, incremental improvements to processes
POKA YOKE - Error-proofing, a method of preventing mistakes from occurring in a proc...
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.
Six Sigma aims to achieve a process that produces no more than 3.4 defects per million opportunities.
It involves five phases: Define, Measure, Analyze, Improve, and Control (DMAIC).
Six Sigma uses statistical tools and techniques to identify and eliminate the root causes of defects.
It is widely used in industrie...
Line balancing is the process of distributing workloads evenly across a production line to optimize efficiency.
It involves analyzing the tasks required for production
Assigning tasks to workstations based on their capacity and skill level
Ensuring that each workstation has a balanced workload
The goal is to minimize idle time and maximize productivity
Example: In a car assembly line, line balancing would involve assigning ...
POKA yoke is a Japanese term for mistake-proofing or error-proofing.
It is a technique used to prevent errors or mistakes in a process.
It involves designing a process or product in a way that makes it impossible or difficult to make mistakes.
Examples include using color coding, shapes, or sensors to prevent errors.
POKA yoke can improve quality, reduce waste, and increase efficiency in a process.
Mistral proofing is a process of protecting electronic devices from damage caused by mistral winds.
Mistral proofing involves designing electronic devices to withstand the strong winds of the Mistral, a cold and dry wind that blows through the Rhone Valley in France.
This process is important for devices that are used in outdoor environments, such as weather stations, surveillance cameras, and communication equipment.
Mis...
OEE stands for Overall Equipment Effectiveness. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying three factors: availability, performance, and quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment runs compared to its maximum speed.
Quality measures the percentage of go...
FPY stands for First Pass Yield, which is the percentage of products that pass quality control on the first attempt.
FPY is a measure of efficiency and quality in manufacturing.
It is calculated by dividing the number of products that pass quality control on the first attempt by the total number of products produced.
For example, if 100 products were produced and 90 passed quality control on the first attempt, the FPY wou...
4M changes refer to changes in Man, Machine, Material, and Method in a manufacturing process.
Man refers to changes in the workforce, such as training or hiring new employees.
Machine refers to changes in equipment or technology used in the manufacturing process.
Material refers to changes in the raw materials used in the manufacturing process.
Method refers to changes in the overall process or procedures used in manufactu...
The question is nonsensical and has no clear answer.
There is no logical or mathematical meaning to '14 Q'.
It is possible that the interviewer is testing the candidate's ability to handle unexpected or confusing questions.
The best approach is to ask for clarification or to provide a humorous response.
Example response: '14 Q? Sounds like a secret code for a top-secret mission.'
14Q principal is a quality control principle that emphasizes on prevention of defects rather than detection and correction.
14Q principle focuses on preventing defects in the production process
It emphasizes on quality control rather than quality assurance
It involves continuous improvement and defect prevention
Examples include using statistical process control and root cause analysis
5S is a workplace organization method that aims to improve efficiency and productivity by organizing and standardizing the workplace.
Sort - eliminate unnecessary items
Set in order - organize remaining items
Shine - clean and inspect the workplace
Standardize - establish procedures and standards
Sustain - maintain and improve the system
Example: organizing tools in a toolbox
Example: labeling and arranging files in a cabinet
...
Get interview-ready with Top Bosch Chassis Systems Interview Questions
I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 4 interview rounds.
I applied via Job Portal and was interviewed in Dec 2020. There were 4 interview rounds.
A sensor is a device that detects and responds to physical input from the environment.
Sensors convert physical quantities into electrical signals.
They are used in various industries for monitoring and control purposes.
Examples of sensors include temperature sensors, pressure sensors, and motion sensors.
PLC stands for Programmable Logic Controller. It is a digital computer used for automation of electromechanical processes.
PLC is a specialized computer designed to control industrial processes and machinery.
It uses a programmable memory to store instructions and execute them in a sequential manner.
PLCs are commonly used in manufacturing, power plants, and other industrial settings.
They can be programmed to monitor inpu...
I applied via Walk-in and was interviewed in Feb 2021. There was 1 interview round.
I applied via Referral and was interviewed before Feb 2021. There were 4 interview rounds.
1hr 50 MCQs Design Of machines, Physics, Instrumentations and Quality control, SOM, Mathematics.
I would expect a salary that is competitive for a Trainee Technician position.
Research the average salary range for Trainee Technicians in your area
Consider your level of experience and education
Factor in any additional skills or certifications you possess
Be prepared to negotiate and discuss benefits package
My family background is diverse and supportive.
My parents come from different cultural backgrounds, which has enriched my upbringing.
I have a close-knit family who has always encouraged me to pursue my interests.
Several members of my family have technical backgrounds, which has inspired my career choice.
My family has always been supportive of my educational and career goals.
I have a strong technical background and a passion for learning and problem-solving.
I have completed relevant technical training and have a solid understanding of the required skills and knowledge.
I am a quick learner and have a strong ability to adapt to new technologies and procedures.
I am highly motivated and dedicated to delivering high-quality work.
I have excellent problem-solving skills and can troubleshoot techn...
I am a dedicated and enthusiastic trainee technician with a strong passion for technology and problem-solving.
I have recently completed my degree in Electrical Engineering.
During my studies, I gained hands-on experience with various technical tools and equipment.
I have also completed internships at two different companies, where I worked on troubleshooting and repairing electronic devices.
I am a quick learner and have ...
I applied via Approached by Company and was interviewed in Oct 2018. There were 5 interview rounds.
Top trending discussions
Some of the top questions asked at the Bosch Chassis Systems interview -
The duration of Bosch Chassis Systems interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 30 interviews
Interview experience
based on 763 reviews
Rating in categories
Quality Engineer
185
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Trainee
153
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Engineer Trainee
120
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Production Engineer
95
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Quality Inspector
93
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
ZF Steering Gear
Mando Automotive
ZF Commercial Vehicle Control Systems
Continental Automotive Components