Filter interviews by
I want to join Bosch because of its reputation for innovation and excellence. In 5 years, I see myself in a leadership role. I am ready to work in shifts. I have successfully completed an improvement project in my current role. The challenges I face in my current employer include outdated technology and lack of collaboration.
Joining Bosch for its reputation for innovation and excellence
Aspiring to be in a leadership ro...
Top trending discussions
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
The company production refers to the manufacturing and output of products or services by the company.
Company production refers to the quantity and quality of goods or services produced.
It includes the manufacturing process, assembly, packaging, and delivery of products.
Production can also involve the provision of services, such as software development or consulting.
The company's production may vary depending on factors...
Shock absorbers are devices used in vehicles to absorb and dampen the impact of bumps and vibrations.
Absorb and dampen the impact of bumps and vibrations
Improve vehicle stability and control
Enhance driver and passenger comfort
Reduce wear and tear on other vehicle components
Maintain tire contact with the road surface
Prevent excessive bouncing and bouncing
Provide consistent handling and braking
Examples: coilover shocks,
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 3 interview rounds.
To reduce the rating of FMEA, focus on improving the severity, occurrence, and detection ratings. Cp and CPK are used to measure process capability.
To reduce FMEA rating, address high severity issues first
Implement controls to reduce the likelihood of high occurrence failure modes
Enhance detection methods to catch potential issues early
Calculate Cp and CPK to assess process capability and make improvements as needed
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There was 1 interview round.
The 7 QC tools are a set of basic tools used for quality control and problem-solving in manufacturing and other industries.
Check sheet: Used to collect and analyze data in a systematic manner.
Histogram: A graphical representation of data distribution.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause-and-effect diagram (Fishbone diagram): Used to identify and analyze potential cau...
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 2 interview rounds.
based on 12 reviews
Rating in categories
Quality Engineer
186
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
Trainee
149
salaries
| ₹1.5 L/yr - ₹2.6 L/yr |
Engineer Trainee
113
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Production Engineer
96
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Quality Inspector
95
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Bosch
Faurecia
Hitachi Astemo
Valeo