Q1. What is TPM KAIZEN POKA YOKE LINE BALANCING OEE CYCLE TIME TKT TIME
TPM, KAIZEN, POKA YOKE, LINE BALANCING, OEE, CYCLE TIME, TKT TIME are all manufacturing terms related to process improvement and efficiency.
TPM - Total Productive Maintenance, a system for maintaining and improving equipment and processes
KAIZEN - Continuous improvement, a philosophy of making small, incremental improvements to processes
POKA YOKE - Error-proofing, a method of preventing mistakes from occurring in a process
LINE BALANCING - Adjusting workloads to optimize effici...read more
Q2. What is 14Q principal
14Q principal is a quality control principle that emphasizes on prevention of defects rather than detection and correction.
14Q principle focuses on preventing defects in the production process
It emphasizes on quality control rather than quality assurance
It involves continuous improvement and defect prevention
Examples include using statistical process control and root cause analysis
Q3. What is six sigma process
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.
Six Sigma aims to achieve a process that produces no more than 3.4 defects per million opportunities.
It involves five phases: Define, Measure, Analyze, Improve, and Control (DMAIC).
Six Sigma uses statistical tools and techniques to identify and eliminate the root causes of defects.
It is widely used in industries such as manufacturing, healthcare, and finance.
Six Sigma...read more
Q4. What is line balencsing
Line balancing is the process of distributing workloads evenly across a production line to optimize efficiency.
It involves analyzing the tasks required for production
Assigning tasks to workstations based on their capacity and skill level
Ensuring that each workstation has a balanced workload
The goal is to minimize idle time and maximize productivity
Example: In a car assembly line, line balancing would involve assigning tasks such as installing doors or wheels to workstations b...read more
Q5. What is mistral profing
Mistral proofing is a process of protecting electronic devices from damage caused by mistral winds.
Mistral proofing involves designing electronic devices to withstand the strong winds of the Mistral, a cold and dry wind that blows through the Rhone Valley in France.
This process is important for devices that are used in outdoor environments, such as weather stations, surveillance cameras, and communication equipment.
Mistral proofing may involve using materials that are resista...read more
Q6. What is 14 Q explain
The question is nonsensical and has no clear answer.
There is no logical or mathematical meaning to '14 Q'.
It is possible that the interviewer is testing the candidate's ability to handle unexpected or confusing questions.
The best approach is to ask for clarification or to provide a humorous response.
Example response: '14 Q? Sounds like a secret code for a top-secret mission.'
Share interview questions and help millions of jobseekers 🌟
Q7. What is 4M changes
4M changes refer to changes in Man, Machine, Material, and Method in a manufacturing process.
Man refers to changes in the workforce, such as training or hiring new employees.
Machine refers to changes in equipment or technology used in the manufacturing process.
Material refers to changes in the raw materials used in the manufacturing process.
Method refers to changes in the overall process or procedures used in manufacturing.
4M changes are often implemented to improve efficienc...read more
Q8. What is 5S explain
5S is a workplace organization method that aims to improve efficiency and productivity by organizing and standardizing the workplace.
Sort - eliminate unnecessary items
Set in order - organize remaining items
Shine - clean and inspect the workplace
Standardize - establish procedures and standards
Sustain - maintain and improve the system
Example: organizing tools in a toolbox
Example: labeling and arranging files in a cabinet
Example: cleaning and inspecting machinery
Example: creatin...read more
Trainee(Line Leader) Jobs
0Q9. What is FPY explain
FPY stands for First Pass Yield, which is the percentage of products that pass quality control on the first attempt.
FPY is a measure of efficiency and quality in manufacturing.
It is calculated by dividing the number of products that pass quality control on the first attempt by the total number of products produced.
For example, if 100 products were produced and 90 passed quality control on the first attempt, the FPY would be 90%.
A high FPY indicates that the manufacturing proc...read more
Q10. What is OEE explain
OEE stands for Overall Equipment Effectiveness. It is a measure of how effectively a manufacturing operation is utilized.
OEE is calculated by multiplying three factors: availability, performance, and quality.
Availability measures the percentage of time that equipment is available for production.
Performance measures the speed at which the equipment runs compared to its maximum speed.
Quality measures the percentage of good quality products produced by the equipment.
OEE can be u...read more
Q11. What is POKA yoke
POKA yoke is a Japanese term for mistake-proofing or error-proofing.
It is a technique used to prevent errors or mistakes in a process.
It involves designing a process or product in a way that makes it impossible or difficult to make mistakes.
Examples include using color coding, shapes, or sensors to prevent errors.
POKA yoke can improve quality, reduce waste, and increase efficiency in a process.