I applied via Referral and was interviewed before Jun 2022. There were 2 interview rounds.
I would start by conducting a thorough analysis of the production requirements, researching available machines, evaluating their capabilities, and considering factors like cost and maintenance.
Conduct a detailed analysis of production requirements
Research available machines in the market
Evaluate the capabilities of different machines
Consider factors like cost, maintenance, and compatibility with existing processes
Consu...
I applied via Approached by Company and was interviewed in Jun 2022. There were 4 interview rounds.
Discussion with Different Process OWNER HOD QA, Engg. Purchase for technical....and previous handling work...
I applied via Referral and was interviewed in Sep 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
posted on 17 Jun 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2022. There were 4 interview rounds.
Question abou TPM, OEE, six Sigma, lean manufacturing,kaizen,poka yoke etc
I applied via Referral and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Approached by Company
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
GD&T symbols are used to specify the geometric requirements of a part or assembly.
GD&T stands for Geometric Dimensioning and Tolerancing
Symbols include: flatness, circularity, perpendicularity, concentricity, position, and more
Each symbol has a specific meaning and is used to communicate precise engineering requirements
GD&T is used in industries such as aerospace, automotive, and manufacturing
Example: A position symbol...
Cp, Cpk, Pp, and Ppk are statistical process control indices used to measure process capability and performance.
Cp and Cpk measure how well a process meets its specifications, with Cpk being more accurate for non-centered processes.
Pp and Ppk measure how well a process performs relative to its natural variation, with Ppk being more accurate for non-centered processes.
All four indices are calculated using the process me...
based on 1 interview
Interview experience
Quality Engineer
185
salaries
| ₹0 L/yr - ₹0 L/yr |
Trainee
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer Trainee
120
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
93
salaries
| ₹0 L/yr - ₹0 L/yr |
ZF Steering Gear
Mando Automotive
ZF Commercial Vehicle Control Systems
Continental Automotive Components