Filter interviews by
I applied via Referral and was interviewed before Jun 2022. There were 2 interview rounds.
I would start by conducting a thorough analysis of the production requirements, researching available machines, evaluating their capabilities, and considering factors like cost and maintenance.
Conduct a detailed analysis of production requirements
Research available machines in the market
Evaluate the capabilities of different machines
Consider factors like cost, maintenance, and compatibility with existing processes
Consu...
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Jun 2022. There were 4 interview rounds.
Discussion with Different Process OWNER HOD QA, Engg. Purchase for technical....and previous handling work...
I applied via Walk-in and was interviewed before Dec 2021. There were 3 interview rounds.
GD&T symbols are used to specify the geometric requirements of a part or assembly.
GD&T stands for Geometric Dimensioning and Tolerancing
Symbols include: flatness, circularity, perpendicularity, concentricity, position, and more
Each symbol has a specific meaning and is used to communicate precise engineering requirements
GD&T is used in industries such as aerospace, automotive, and manufacturing
Example: A position symbol...
Cp, Cpk, Pp, and Ppk are statistical process control indices used to measure process capability and performance.
Cp and Cpk measure how well a process meets its specifications, with Cpk being more accurate for non-centered processes.
Pp and Ppk measure how well a process performs relative to its natural variation, with Ppk being more accurate for non-centered processes.
All four indices are calculated using the process me...
Casting should be thorough
Aluminium die Casting
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
based on 1 interview
Interview experience
Quality Engineer
185
salaries
| ₹0 L/yr - ₹0 L/yr |
Trainee
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer Trainee
120
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
93
salaries
| ₹0 L/yr - ₹0 L/yr |
ZF Steering Gear
Mando Automotive
ZF Commercial Vehicle Control Systems
Continental Automotive Components