Pile foundation is a type of deep foundation used to transfer loads from superstructure to soil or rock strata below.
Driven piles: concrete, steel, timber
Bored piles: cast-in-situ, precast
Screw piles: helical steel piles
Micropiles: small diameter piles
Composite piles: combination of different materials
Friction piles: transfer load through friction between pile and soil
End bearing piles: transfer load through end bearin
Primary steel is used for structural purposes while secondary steel is used for non-structural purposes.
Primary steel is used for load-bearing structures such as columns and beams.
Secondary steel is used for non-load-bearing structures such as roofing and cladding.
Primary steel is typically more expensive and of higher quality than secondary steel.
Examples of primary steel include I-beams and H-columns, while examples ...
The level can be measured using various instruments and techniques.
Use a spirit level to measure the level of a surface
Use a laser level to project a level line across a room
Use a water level to measure the level of two points that are not in direct line of sight
Use a digital level to measure the angle of a surface
Use a surveyor's level to measure the level of a large area
Use a clinometer to measure the angle of a slop...
The most commonly used bond in residential building masonry brickwork is the stretcher bond.
Stretcher bond is the most common bond used in residential building masonry brickwork.
It consists of bricks laid in a pattern where each brick is offset by half a brick length from the course below.
This bond is easy to lay and requires fewer bricks than other bonds.
It is also aesthetically pleasing and provides good structural s...
I applied via Company Website and was interviewed in Jan 2021. There were 4 interview rounds.
I was interviewed before Mar 2021.
Blg Construction Services interview questions for popular designations
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
based on 3 interviews
Interview experience
based on 57 reviews
Rating in categories
Mechanical Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Field Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Quaity Control Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Project Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Shapoorji Pallonji Group
Tata Projects
Hindustan Construction Company