i
Bimbo Bakeries India
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
Top trending discussions
posted on 16 Sep 2024
I applied via Job Fair and was interviewed in Aug 2024. There were 3 interview rounds.
Time work, time distance, profit and loss
I am a dedicated Mechanical Maintenance Engineer with 5 years of experience in troubleshooting, repairing, and maintaining mechanical systems.
Experienced in conducting regular inspections to identify and address mechanical issues
Skilled in performing preventive maintenance to ensure optimal functioning of equipment
Proficient in using tools and equipment to repair and replace faulty components
Strong knowledge of mechani...
My strengths include strong problem-solving skills, attention to detail, and a solid technical knowledge.
Strong problem-solving skills - I am able to quickly identify and resolve mechanical issues to ensure minimal downtime.
Attention to detail - I meticulously inspect equipment to catch potential problems before they escalate.
Solid technical knowledge - I have a deep understanding of mechanical systems and how to maint
I am passionate about solving mechanical problems and ensuring equipment runs smoothly.
I have always been fascinated by how machines work and enjoy troubleshooting issues.
I have a strong background in mechanical engineering and hands-on experience in maintenance.
I am excited about the opportunity to contribute to the efficiency and reliability of the company's machinery.
I thrive in fast-paced environments where I can a...
I applied via Naukri.com and was interviewed in Mar 2024. There was 1 interview round.
Erection and commissioning of a pneumatic compressor involves assembling the components, connecting the necessary piping, testing for functionality, and fine-tuning for optimal performance.
Assemble the components of the pneumatic compressor according to the manufacturer's instructions.
Connect the necessary piping for air intake, compression, and output.
Test the compressor for functionality by running it empty and check...
Blowdown of cooling tower can be calculated using cycles of concentration. Maintenance practices include regular cleaning, inspection, and water treatment. Cooling tower capacity can be calculated based on heat load and design parameters.
Calculate blowdown using cycles of concentration formula: Blowdown = Evaporation Loss / (Cycles of Concentration - 1)
Maintenance practices include regular cleaning of cooling tower fil...
RCM stands for Reliability Centered Maintenance, a proactive maintenance strategy focused on identifying and preventing equipment failures.
RCM is a systematic approach to maintenance planning that aims to optimize maintenance tasks to ensure equipment reliability.
It involves analyzing the functions and potential failure modes of equipment to determine the most effective maintenance strategies.
RCM prioritizes maintenanc...
Pumps can be classified based on their casings as follows: volute casing, axial split casing, and radial split casing.
Volute casing pumps have a spiral-shaped casing that gradually expands to the discharge outlet.
Axial split casing pumps have a casing split along the horizontal centerline of the pump.
Radial split casing pumps have a casing split along the vertical centerline of the pump.
Air compressor works by compressing air to increase its pressure and decrease its volume.
Air is drawn into the compressor through an intake valve.
The air is then compressed using a piston or rotating impeller.
Compressed air is stored in a tank or released directly for use.
Examples of air compressors include reciprocating, rotary screw, and centrifugal compressors.
I was interviewed in Jun 2024.
posted on 1 Aug 2023
Communication skills
The amount of amps a 30 kW motor takes depends on the voltage it is operating at.
The formula to calculate amps is: Amps = kW / (Volts * 1.73)
For example, a 30 kW motor operating at 480 volts would take approximately 36 amps
Higher voltage motors will draw fewer amps compared to lower voltage motors
I was interviewed in Oct 2023.
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
Yes, PLC can be repaired by troubleshooting, replacing faulty components, and reprogramming if necessary.
PLC can be repaired by troubleshooting to identify the root cause of the issue.
Faulty components can be replaced to restore the functionality of the PLC.
Reprogramming may be necessary if the issue is related to the software or logic of the PLC.
Regular maintenance and timely repairs can help prevent major breakdowns
DG maintenance process involves regular inspections, testing, and servicing of diesel generators to ensure optimal performance and reliability.
Regularly inspecting the diesel generator for any signs of wear or damage
Testing the generator's components such as fuel system, cooling system, and electrical system
Servicing the generator by changing oil, filters, and spark plugs as needed
Keeping maintenance records and schedu...
Interview experience
Sales Executive
27
salaries
| ₹3.3 L/yr - ₹6.5 L/yr |
Electrician
13
salaries
| ₹2.2 L/yr - ₹3.4 L/yr |
Senior Sales Executive
13
salaries
| ₹3.5 L/yr - ₹7.1 L/yr |
Assistant Manager
12
salaries
| ₹6.2 L/yr - ₹17.5 L/yr |
Production Officer
12
salaries
| ₹3.2 L/yr - ₹6.6 L/yr |
Box8
Faasos Food Services
InnerChef
Swiggy