Filter interviews by
I applied via Recruitment Consultant and was interviewed in Aug 2020. There was 1 interview round.
Accutval PM is a preventive maintenance program for mechanical equipment.
Accutval PM is a comprehensive maintenance program that includes regular inspections, cleaning, lubrication, and replacement of worn parts.
It is designed to prevent equipment breakdowns and extend the lifespan of mechanical equipment.
Accutval PM can be customized to meet the specific needs of different types of equipment and industries.
Examples of...
Breakdowns are handled by identifying the root cause, prioritizing repairs, and implementing preventive measures.
Conduct a thorough investigation to determine the cause of the breakdown
Prioritize repairs based on the impact on production and safety
Implement preventive measures to avoid future breakdowns
Maintain a record of breakdowns and repairs for analysis and improvement
Train and educate staff on proper maintenance
Time based maintenance is a maintenance strategy based on a predetermined schedule.
It involves performing maintenance tasks at set intervals, regardless of the equipment's condition.
It is often used for equipment that is not critical to operations.
Examples include changing air filters every three months or replacing belts every six months.
It can be less effective than condition-based maintenance, which takes into accou...
Predictive maintenance is a technique that uses data analysis to predict when equipment maintenance is needed.
It involves monitoring equipment performance and collecting data
Data is analyzed to identify patterns and predict when maintenance is needed
This helps to prevent equipment failure and reduce downtime
Examples include using sensors to monitor machine vibrations or oil analysis to detect wear in engines
Autonomous maintenance is a maintenance approach where operators take responsibility for routine maintenance tasks.
Operators are trained to perform routine maintenance tasks
Operators conduct inspections and minor repairs
Autonomous maintenance reduces downtime and improves equipment reliability
Operators become more familiar with equipment and can identify potential issues
Autonomous maintenance is a key component of Tota
Controlling inventory of spare parts involves monitoring stock levels, forecasting demand, and optimizing procurement processes.
Regularly monitor stock levels to ensure adequate inventory
Forecast demand based on historical data and upcoming projects
Optimize procurement processes to minimize lead times and costs
Implement a system for tracking inventory and ordering parts
Establish relationships with reliable suppliers
Con...
Total productive maintenance is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.
TPM involves regular maintenance and inspection of equipment to prevent breakdowns
It emphasizes employee involvement and training to improve equipment performance
TPM also includes continuous improvement efforts to optimize equipment and processes
Examples of TPM techniques include autonomous mainten...
The equipment is in good health with regular maintenance and inspections.
Regular maintenance and inspections are conducted to ensure optimal performance.
Any issues or malfunctions are promptly addressed and repaired.
The equipment is regularly cleaned and lubricated to prevent wear and tear.
Performance data is regularly monitored and analyzed to identify any potential issues.
Spare parts and backup equipment are availabl
We maintain equipment history records through a computerized maintenance management system (CMMS).
We use a CMMS to track maintenance activities, repairs, and replacements.
Each equipment has a unique identification number and maintenance log.
We record the date, time, and details of each maintenance activity.
We also keep track of the cost of maintenance and replacement parts.
The CMMS generates reports on equipment perfor...
Top trending discussions
posted on 19 Sep 2022
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2023. There were 3 interview rounds.
Talk about a topic on current affairs ie air pollution
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
I appeared for an interview before Jan 2021.
Diploma
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
My current position involves leading cross-functional teams and driving technical innovation.
I am responsible for leading a team of engineers in developing new products and technologies.
I work closely with other departments such as marketing and sales to ensure alignment on project goals.
I am involved in setting technical direction and strategy for the team, as well as mentoring junior engineers.
I have successfully imp...
I applied via Company Website and was interviewed in May 2019. There were 4 interview rounds.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 12 May 2018
Engineer
427
salaries
| ₹2.6 L/yr - ₹7.5 L/yr |
Senior Engineer
393
salaries
| ₹3 L/yr - ₹9.3 L/yr |
Assistant Manager
314
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Assistant Engineer
286
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Mechanical Engineer
133
salaries
| ₹2.5 L/yr - ₹7.6 L/yr |
Larsen & Toubro Limited
UltraTech Cement
Tata Steel
Shapoorji Pallonji Group