i
Bharat Wire
Ropes
Filter interviews by
Experienced Electrical Automation Manager with a strong family background in engineering and a passion for innovative technology solutions.
I have over 10 years of experience in electrical automation, leading projects that improved efficiency by 30%.
My family has a rich engineering background; my father was an electrical engineer, which inspired my career path.
I hold a Master's degree in Electrical Engineering, spe...
To repair desktop and laptop, troubleshoot hardware and software issues, replace faulty components, update drivers and software, and perform system diagnostics.
Troubleshoot hardware and software issues
Replace faulty components such as RAM, hard drive, or motherboard
Update drivers and software to the latest versions
Perform system diagnostics to identify the root cause of the problem
Managing a network with a level 1 switch involves basic configuration and monitoring.
Assigning IP addresses to devices connected to the switch
Setting up VLANs for network segmentation
Monitoring network traffic and performance using basic tools like ping and traceroute
Implementing basic security measures such as MAC address filtering
Troubleshooting connectivity issues by checking cable connections and device config...
I have extensive experience in strategic sourcing, supplier relationship management, contract negotiation, and cost reduction initiatives.
Strategic sourcing to identify cost-saving opportunities
Supplier relationship management to ensure timely delivery and quality products
Contract negotiation to secure favorable terms and conditions
Cost reduction initiatives to optimize procurement processes
Experience in implement...
To find shortage, analyze inventory levels, track demand, and monitor supply chain.
Analyze inventory levels regularly to identify any shortages.
Track demand patterns and forecast future demand to anticipate shortages.
Monitor the supply chain for any disruptions or delays that may lead to shortages.
Maintain good communication with suppliers to ensure timely delivery of goods.
Implement effective inventory management...
The last company's material purchase strategy involved optimizing procurement processes, leveraging supplier relationships, and implementing cost-saving measures.
Implemented a centralized procurement system to streamline purchasing activities
Negotiated long-term contracts with key suppliers to ensure stable pricing and availability
Conducted regular supplier evaluations to assess performance and identify areas for ...
To get the right item as a Purchase Manager, one must consider factors such as quality, price, supplier reliability, and specific requirements.
Define the specific requirements and specifications of the item needed
Research and identify potential suppliers or vendors
Evaluate the quality and reliability of the suppliers
Compare prices and negotiate for the best deal
Consider factors like delivery time, after-sales supp...
To find the right material for a purchase, conduct thorough research, analyze specifications, compare prices and quality, and seek recommendations.
Research different suppliers and manufacturers to identify the available materials.
Analyze the specifications of each material to ensure it meets the required standards and criteria.
Compare prices and quality of the materials from different sources to make an informed d...
Negotiating with vendors involves effective communication, research, and finding mutually beneficial solutions.
Prepare by researching market prices and vendor alternatives.
Clearly communicate your requirements and expectations.
Listen to the vendor's perspective and understand their constraints.
Explore options for cost reduction, bulk discounts, or value-added services.
Consider long-term partnerships and loyalty pr...
Material actual price can be calculated by considering the cost of raw materials, production expenses, and overhead costs.
Calculate the cost of raw materials used in production
Include production expenses such as labor, utilities, and equipment costs
Factor in overhead costs like rent, insurance, and administrative expenses
Sum up all these costs to determine the material actual price
The last company's material purchase strategy involved optimizing procurement processes, leveraging supplier relationships, and implementing cost-saving measures.
Implemented a centralized procurement system to streamline purchasing activities
Negotiated long-term contracts with key suppliers to ensure stable pricing and availability
Conducted regular supplier evaluations to assess performance and identify areas for impro...
Negotiating with vendors involves effective communication, research, and finding mutually beneficial solutions.
Prepare by researching market prices and vendor alternatives.
Clearly communicate your requirements and expectations.
Listen to the vendor's perspective and understand their constraints.
Explore options for cost reduction, bulk discounts, or value-added services.
Consider long-term partnerships and loyalty program...
Material actual price can be calculated by considering the cost of raw materials, production expenses, and overhead costs.
Calculate the cost of raw materials used in production
Include production expenses such as labor, utilities, and equipment costs
Factor in overhead costs like rent, insurance, and administrative expenses
Sum up all these costs to determine the material actual price
To find the right material for a purchase, conduct thorough research, analyze specifications, compare prices and quality, and seek recommendations.
Research different suppliers and manufacturers to identify the available materials.
Analyze the specifications of each material to ensure it meets the required standards and criteria.
Compare prices and quality of the materials from different sources to make an informed decisi...
To find shortage, analyze inventory levels, track demand, and monitor supply chain.
Analyze inventory levels regularly to identify any shortages.
Track demand patterns and forecast future demand to anticipate shortages.
Monitor the supply chain for any disruptions or delays that may lead to shortages.
Maintain good communication with suppliers to ensure timely delivery of goods.
Implement effective inventory management tech...
New vendor development involves identifying, evaluating, and onboarding suppliers to enhance procurement efficiency and quality.
Conduct market research to identify potential vendors based on quality, price, and reliability.
Evaluate vendors through a rigorous selection process, including site visits and audits.
Establish clear criteria for vendor performance, such as delivery times and product quality.
Build relationships...
To get the right item as a Purchase Manager, one must consider factors such as quality, price, supplier reliability, and specific requirements.
Define the specific requirements and specifications of the item needed
Research and identify potential suppliers or vendors
Evaluate the quality and reliability of the suppliers
Compare prices and negotiate for the best deal
Consider factors like delivery time, after-sales support, ...
I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.
I have extensive experience in strategic sourcing, supplier relationship management, contract negotiation, and cost reduction initiatives.
Strategic sourcing to identify cost-saving opportunities
Supplier relationship management to ensure timely delivery and quality products
Contract negotiation to secure favorable terms and conditions
Cost reduction initiatives to optimize procurement processes
Experience in implementing e...
Procurement journey and procurement experience
posted on 6 Feb 2025
I appeared for an interview before Feb 2024.
To repair desktop and laptop, troubleshoot hardware and software issues, replace faulty components, update drivers and software, and perform system diagnostics.
Troubleshoot hardware and software issues
Replace faulty components such as RAM, hard drive, or motherboard
Update drivers and software to the latest versions
Perform system diagnostics to identify the root cause of the problem
Managing a network with a level 1 switch involves basic configuration and monitoring.
Assigning IP addresses to devices connected to the switch
Setting up VLANs for network segmentation
Monitoring network traffic and performance using basic tools like ping and traceroute
Implementing basic security measures such as MAC address filtering
Troubleshooting connectivity issues by checking cable connections and device configurati...
I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.
7QC tools are quality control tools used to identify and solve quality-related issues. MTTR stands for Mean Time To Repair, MTBF stands for Mean Time Between Failures.
7QC tools include Pareto analysis, cause-and-effect diagram, scatter diagram, etc.
MTTR is the average time taken to repair a failed component or system.
MTBF is the average time between failures of a component or system.
Types of breakdowns can include mech...
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
It's the aptitude test it's a total 40 question and the passing marks are 35-40 to qualied the next round and each question are 1 marks no negative marks are allot.
Heat treatment is a process used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Heat treatment involves heating a material to a specific temperature, holding it at that temperature for a certain amount of time, and then cooling it at a controlled rate.
Common heat treatment processes include annealing, tempering, quenching, and case hardening.
Pettenting is a heat treatm...
I appeared for an interview in Mar 2023, where I was asked the following questions.
I appeared for an interview before Jan 2024.
I am from a small town in the Midwest known for its manufacturing industry.
I grew up in a town with a strong focus on manufacturing and industrial engineering
The town is known for its factories and production facilities
I have always been interested in how things are made and improving processes
Yes, I am open to relocating to Chalisgaon for the right opportunity.
I am willing to relocate for the right job opportunity
I am open to exploring new locations and experiences
I believe Chalisgaon offers potential for growth in my career
What is 5S, 7QC tools, 8D
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Bharat Wire Ropes interview for experienced candidates -
The duration of Bharat Wire Ropes interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 11 interview experiences
Difficulty level
Duration
based on 242 reviews
Rating in categories
Production Engineer
42
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Assistant Manager
35
salaries
| ₹4.5 L/yr - ₹8.7 L/yr |
Senior Production Engineer
33
salaries
| ₹3 L/yr - ₹6 L/yr |
Senior Engineer
27
salaries
| ₹3.6 L/yr - ₹6.5 L/yr |
Graduate Engineer Trainee (Get)
26
salaries
| ₹1.6 L/yr - ₹3.2 L/yr |
Tata Steel
JSW Steel
Jindal Stainless
Jindal Saw