Quality Assurance focuses on preventing defects while Quality Control focuses on identifying and correcting defects.
Quality Assurance is a proactive process that involves planning, designing, and implementing processes to prevent defects from occurring.
Quality Control is a reactive process that involves identifying defects and taking corrective action to eliminate them.
Quality Assurance is focused on the entire process...
Top trending discussions
I was interviewed in Dec 2016.
I am a passionate mechanical engineering student with a keen interest in design and manufacturing. I chose mechanical department due to my love for machines and problem-solving.
Passionate about design and manufacturing
Interest in problem-solving
Chose mechanical department due to love for machines
Academic projects focused on innovative designs and practical applications
I applied via Referral and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.
First off all, we ought to have some sortoff automobile and production knowledge because they will definitely check our technical skill secondly, listening skill and fluency plays significant factor
TQBM stands for 'Tudo Que Bem' which means 'Everything is fine' in Portuguese. BOM means 'good' in Portuguese.
TQBM is a common phrase used in Brazil to ask if everything is okay.
BOM is often used as a response to TQBM to indicate that everything is good.
Both TQBM and BOM are informal and commonly used in everyday conversations.
Example: A friend asks 'TQBM?' and you respond 'BOM, e voce?' which means 'Everything is fine
I applied via Referral and was interviewed before Feb 2021. There was 1 interview round.
Line balancing is the process of optimizing workstations in a production line to minimize idle time and maximize efficiency.
It involves analyzing the production process and identifying bottlenecks
Tasks are then rearranged to balance the workload across workstations
The goal is to achieve a smooth and continuous flow of work
Example: In a car assembly line, line balancing would involve ensuring that each workstation has a...
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
Assistant Manager
566
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
286
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
282
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
158
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
147
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Motors
Mahindra & Mahindra
Ashok Leyland
TVS Motor