Upload Button Icon Add office photos

Filter interviews by

BEIGH CONSTRUCTION COMPANY PvT. QS & billing engineer Interview Questions and Answers for Experienced

Updated 8 Jun 2023

BEIGH CONSTRUCTION COMPANY PvT. QS & billing engineer Interview Experiences for Experienced

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How can you calculate quantities of various items?
  • Ans. 

    Quantities of various items can be calculated by taking measurements, using formulas, and considering factors like wastage and shrinkage.

    • Measurements of length, width, height, etc. are taken to calculate quantities of items like concrete, steel, bricks, etc.

    • Formulas specific to each item are used to calculate quantities, such as volume for concrete or weight for steel.

    • Factors like wastage and shrinkage are considered w...

  • Answered by AI
  • Q2. How can you calculate area of irregular sections?
  • Ans. 

    The area of irregular sections can be calculated using various methods such as breaking it down into simpler shapes and summing their areas.

    • Break down the irregular section into simpler shapes such as rectangles, triangles, or circles.

    • Calculate the area of each simpler shape using the appropriate formula (e.g. area of rectangle = length x width, area of triangle = 0.5 x base x height).

    • Sum up the areas of all the simple...

  • Answered by AI

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Hard
Process Duration
-
Result
-

I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Core Technical questions related to job profile
  • Q2. Billing process, some quantity Question
Round 2 - Aptitude Test 

Summary question and also some coding of alphabet

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Quantity surveyor
  • Q2. Planning & monitoring
  • Q3. Regarding to Billing and Planning

Interview Preparation Tips

Interview preparation tips for other job seekers - no
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How much experience
  • Q2. What expected salary
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Client billing , QS

Interview Preparation Tips

Interview preparation tips for other job seekers - Simple

Billing Engineer Interview Questions & Answers

TCE user image Er. Vyankatesh Gundu

posted on 30 Nov 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Qualification & Experience details
  • Q3. What is your Salary Expectation
Round 3 - Technical 

(3 Questions)

  • Q1. What is Pile Foundation?
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer heavy loads of a structure to a deeper level of soil or rock.

    • Pile foundation is used when the soil at the surface is not strong enough to support the weight of the structure.

    • It consists of long, slender columns made of concrete, steel or timber that are driven into the ground.

    • The piles are driven deep enough to reach a layer of soil or rock that is strong en...

  • Answered by AI
  • Q2. Basics of civil engineering
  • Q3. Major Bridge, Viaduct
Round 4 - HR 

(3 Questions)

  • Q1. Salary Discussion & finalization
  • Q2. Posting Related Questions
  • Q3. General questions by employee and answers by HR

Interview Preparation Tips

Interview preparation tips for other job seekers - study basics of civil engineering, study related to job profile
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About budgeting
  • Q2. About rate analysis
Round 3 - Technical 

(2 Questions)

  • Q1. About scheduling
  • Q2. About budgeting

I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Prepare BBS sheet , study a drawing and calculate the Quantity Details , about Contractors Billing, preparing Daily and monthly progress report,Study the Drawing and BOQ preparation and raising the materi...

Interview Preparation Tips

Topics to prepare for G R Infraprojects Billing Engineer interview:
  • Billing
Interview preparation tips for other job seekers - Don’t worry.They are Very Friendly. If you don’t know the answer of any questions then tell them. They will give you the answer.

I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Rates of sub-contractors . Billing process. Reconciliation means and how it is done. Rate Analysis. Key points of your last project. Type of structure that you had seen in your last company. And their deta...
  • Ans. 

    The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.

    • Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process

    • Discussed the importance of reconciliation in ensuring accurate billing and payment

    • Described the process of rate analysis and how ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident and never ever show that u r nervous even if u don't know the answer.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Escalation, Contractor bill
  • Q2. Esclation, is code 1200 all part

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company but salary late

BEIGH CONSTRUCTION COMPANY PvT. Interview FAQs

How many rounds are there in BEIGH CONSTRUCTION COMPANY PvT. QS & billing engineer interview for experienced candidates?
BEIGH CONSTRUCTION COMPANY PvT. interview process for experienced candidates usually has 2 rounds. The most common rounds in the BEIGH CONSTRUCTION COMPANY PvT. interview process for experienced candidates are Resume Shortlist and One-on-one Round.
What are the top questions asked in BEIGH CONSTRUCTION COMPANY PvT. QS & billing engineer interview for experienced candidates?

Some of the top questions asked at the BEIGH CONSTRUCTION COMPANY PvT. QS & billing engineer interview for experienced candidates -

  1. How can you calculate quantities of various ite...read more
  2. How can you calculate area of irregular sectio...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 BEIGH CONSTRUCTION COMPANY PvT. interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 691 Interviews
Tata Projects Interview Questions
4.3
 • 398 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Tata Technologies Interview Questions
3.7
 • 247 Interviews
TCE Interview Questions
3.8
 • 239 Interviews
View all
Site Engineer
5 salaries
unlock blur

₹3 L/yr - ₹4.5 L/yr

Junior Engineer
5 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Civil Engineer
4 salaries
unlock blur

₹3 L/yr - ₹5 L/yr

Engineer
3 salaries
unlock blur

₹1.8 L/yr - ₹3.6 L/yr

Procurement Manager
3 salaries
unlock blur

₹8.5 L/yr - ₹9.5 L/yr

Explore more salaries
Compare BEIGH CONSTRUCTION COMPANY PvT. with

Larsen & Toubro Limited

4.0
Compare

Tata Technologies

3.7
Compare

Tata Projects

4.3
Compare

L&T Construction

4.0
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview