Quantities of various items can be calculated by taking measurements, using formulas, and considering factors like wastage and shrinkage.
Measurements of length, width, height, etc. are taken to calculate quantities of items like concrete, steel, bricks, etc.
Formulas specific to each item are used to calculate quantities, such as volume for concrete or weight for steel.
Factors like wastage and shrinkage are considered w...
The area of irregular sections can be calculated using various methods such as breaking it down into simpler shapes and summing their areas.
Break down the irregular section into simpler shapes such as rectangles, triangles, or circles.
Calculate the area of each simpler shape using the appropriate formula (e.g. area of rectangle = length x width, area of triangle = 0.5 x base x height).
Sum up the areas of all the simple...
Top trending discussions
posted on 5 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
Summary question and also some coding of alphabet
Rate analysis of variation items in contract involves calculating the cost impact of changes in scope or specifications.
Rate analysis involves determining the cost of materials, labor, and equipment for the variation items.
It helps in evaluating the impact of changes on the overall project budget.
Factors like quantity, rates, and specifications are considered in the analysis.
Examples of variation items include changes ...
posted on 1 Dec 2023
I applied via Referral and was interviewed in Nov 2023. There were 2 interview rounds.
Tax deduction in RA BILL
Tax deduction is applicable on certain items in a RA bill
The deduction amount varies based on the item and tax laws
Examples of items with tax deduction include TDS, GST, and service tax
Price escalation refers to the increase in the cost of goods or services over time.
It is a common phenomenon in the construction industry where the cost of materials and labor increases over time.
Price escalation can be caused by various factors such as inflation, changes in market demand and supply, and changes in government policies.
It is important for billing engineers to take price escalation into account when esti...
The volume of a trapezoidal shape can be calculated using its height and the lengths of its parallel sides.
The formula for calculating the volume of a trapezoidal shape is (1/2) x height x (length of parallel side 1 + length of parallel side 2)
The height is the perpendicular distance between the parallel sides
For example, if the trapezoidal shape has a height of 5 units, a length of parallel side 1 of 8 units, and a le...
Wastage for concrete and steel depends on various factors such as site conditions, workmanship, and design.
Wastage for concrete can range from 2% to 10% depending on the quality of workmanship and site conditions.
Wastage for steel can range from 2% to 5% depending on the design and fabrication process.
Factors such as improper handling, cutting, and bending can also contribute to wastage.
Proper planning and management c...
Variation for extra items is a common occurrence in construction projects.
Extra items may include additional work, materials, or changes in design.
The variation may be initiated by the client or due to unforeseen circumstances.
The billing engineer must accurately document and price the extra items.
The variation may require approval from the client and/or consultant before proceeding.
Examples of extra items include addi...
An account engineer manages financial accounts while a billing engineer handles billing and invoicing.
Account engineers manage financial accounts and ensure that all financial transactions are recorded accurately.
Billing engineers handle billing and invoicing processes, ensuring that customers are billed correctly and payments are received on time.
While both roles involve financial management, account engineers focus o...
posted on 22 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.
posted on 3 Feb 2022
posted on 8 May 2023
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
Interview experience
Site Engineer
5
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Junior Engineer
5
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Civil Engineer
4
salaries
| ₹3 L/yr - ₹5 L/yr |
Engineer
3
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Procurement Manager
3
salaries
| ₹8.5 L/yr - ₹9.5 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures