posted on 3 May 2019
I applied via Approached by Company and was interviewed before May 2018. There were 3 interview rounds.
posted on 6 Feb 2021
I applied via Naukri.com and was interviewed before Feb 2020. There were 2 interview rounds.
A purified water system typically consists of multiple stages to remove impurities and ensure water quality.
The water first goes through a pre-treatment stage to remove large particles and debris.
Next, the water is passed through a series of filters to remove smaller particles and impurities.
After filtration, the water may undergo processes such as reverse osmosis or distillation to further purify it.
Finally, the purif...
The procedure for calibrating the RPM indicator involves adjusting the settings to ensure accurate readings.
Ensure the RPM indicator is connected to a stable power source.
Use a known standard RPM value to compare the indicator readings.
Adjust the calibration settings on the indicator until it matches the standard value.
Repeat the process if necessary to achieve accurate calibration.
Document the calibration process for
Experienced engineering professional with a background in QA and management roles.
Over 8 years of experience in engineering QA
Managed a team of QA engineers at previous company
Strong background in software testing methodologies
Certified in Agile and Scrum practices
Passionate about continuous improvement and quality assurance
I currently manage a team of 10 engineers in the QA department. I utilize a combination of leadership, communication, and technical skills to effectively manage the team.
Regularly communicate with team members to understand their needs and challenges
Provide guidance and support to help team members achieve their goals
Set clear expectations and goals for the team
Delegate tasks effectively based on team members' strength...
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
Shop floor activities in production involve dispensing, manufacturing, packaging, and quality control.
Dispensing of raw materials
Manufacturing of products
Packaging of finished goods
Quality control checks throughout the process
Cleaning and maintenance of equipment
Documentation of all activities
Training of personnel
Adherence to safety protocols
Compression machine parameters and defects identification
Compression machine parameters include force, speed, and displacement
Defects can be identified through visual inspection and testing
Common defects include cracks, voids, and delamination
Testing methods include ultrasonic testing and dye penetrant inspection
posted on 31 Jan 2022
posted on 18 Oct 2021
I applied via Company Website and was interviewed in Aug 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
I have worked with various processes and equipment in my previous roles.
I have experience with process optimization and improvement.
I have worked with equipment maintenance and troubleshooting.
I have used software tools for data analysis and reporting.
I have trained team members on process and equipment usage.
I have implemented safety protocols and procedures.
Examples: Lean Six Sigma methodologies, CNC machines, data a
I have experience working with pressurized water reactors (PWR) and boiling water reactors (BWR).
Pressurized water reactors (PWR)
Boiling water reactors (BWR)
To apply heating, cooling, chilling, and brine to reactor, I will use appropriate equipment and control systems.
Select appropriate equipment for heating, cooling, chilling, and brine application
Install and connect the equipment to the reactor
Set up control systems to regulate the temperature and flow rate of the heating, cooling, chilling, and brine
Monitor the process to ensure the desired temperature and flow rate is ...
I have handled various solvents including acetone, ethanol, and methanol. I am familiar with their boiling points and densities.
Acetone - boiling point: 56.05°C, density: 0.789 g/cm³
Ethanol - boiling point: 78.37°C, density: 0.789 g/cm³
Methanol - boiling point: 64.7°C, density: 0.7918 g/cm³
The equations I use for charging lot into the reactor depend on the type of lot and the reactor design.
Equations vary based on lot type and reactor design
Factors such as temperature, pressure, and flow rate must be considered
Examples of equations include mass balance equations and energy balance equations
posted on 26 Jun 2021
Equipment and area qualifications/validations ensure that all equipment and areas meet the required standards for production.
Equipment and areas must be qualified and validated before use in production.
Qualification ensures that equipment is installed and operates correctly.
Validation ensures that equipment and areas consistently produce the desired results.
Qualification and validation processes involve testing, docume...
Filter integrities are performed to ensure the quality and efficiency of the production process.
Filter integrities involve checking the condition and performance of filters used in the production process.
This is done to ensure that the filters are functioning properly and not clogged or damaged.
Filter integrities are important to maintain the quality of the product and prevent contamination.
Examples of filter integriti...
based on 2 reviews
Rating in categories
Business Officer
3
salaries
| ₹3.3 L/yr - ₹6 L/yr |
Business Application Manager
3
salaries
| ₹20 L/yr - ₹24 L/yr |
Intas Pharmaceuticals
Hetero
MSN Laboratories
Micro Labs