Filter interviews by
I applied via Referral and was interviewed in Apr 2023. There were 2 interview rounds.
Top trending discussions
posted on 13 May 2018
I am a recent graduate with a passion for learning and a strong work ethic.
Recent graduate with a degree in [specific field]
Passionate about [specific interest or hobby]
Strong work ethic demonstrated through [relevant experience or projects]
posted on 8 Mar 2022
I applied via NAPS and was interviewed before Mar 2021. There were 2 interview rounds.
I am a motivated and enthusiastic individual with a strong desire to learn and grow in the apprentice trainee role.
I have recently completed my high school education with excellent grades.
I have a passion for hands-on learning and practical experience.
I am a quick learner and adapt well to new environments.
I have good communication and teamwork skills.
I am eager to contribute to the success of the company and develop m
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
posted on 17 Nov 2024
I applied via Company Website and was interviewed in May 2024. There was 1 interview round.
Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.
Ohm's law is expressed as V = I * R, where V is the voltage, I is the current, and R is the resistance.
It helps in calculating the current, voltage, or resistance in a circuit when the other two values are known.
For example, if a circuit has a vol...
I applied via Company Website and was interviewed before Sep 2021. There were 2 interview rounds.
To identify if a pump is cavitating while working on a DCS panel, you can look for certain indicators.
Monitor the pump's suction pressure. If it is fluctuating or dropping below the specified range, it may indicate cavitation.
Check the pump's discharge pressure. If it is higher than normal, it could be a sign of cavitation.
Listen for unusual noises such as a rattling or grinding sound coming from the pump.
Inspect the p...
To prepare a hydrocarbon vessel for vessel entry, follow these steps:
Ensure the vessel is properly isolated from the process and all sources of energy
Ventilate the vessel to remove any flammable or toxic gases
Perform a thorough inspection of the vessel for any signs of leaks or damage
Implement proper lockout/tagout procedures to prevent accidental activation of equipment
Provide appropriate personal protective equipment...
I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.
My GD topic was renewable energy.
I am a Senior Engineer with 10+ years of experience in designing and implementing complex systems.
10+ years of experience in engineering
Specialize in designing and implementing complex systems
Strong problem-solving skills
Experience with various programming languages such as Java, Python, and C++
Seeking new challenges and growth opportunities at GAIL.
Desire for new challenges and opportunities for growth
Interested in working in a different industry or with different technologies
Attracted to GAIL's reputation and projects
Seeking a more collaborative and innovative work environment
My parents are both retired now, but my father used to work as a civil engineer and my mother was a teacher.
Father worked as a civil engineer
Mother was a teacher
Both are retired now
Yes, I have visited Delhi earlier for a business trip.
Visited Delhi for a business trip
Explored historical sites like Red Fort and Qutub Minar
Enjoyed local cuisine like butter chicken and chaat
I am staying at a hotel in Sector 18, Noida for the interview process.
Staying at a hotel in Sector 18, Noida
Close to the interview location
Comfortable accommodation for the duration of the process
Decoking process involves removing coke deposits from cracking furnace and naphtha circuit to maintain efficiency.
Decoking process involves burning off coke deposits using controlled combustion.
Mechanical decoking involves using high-pressure water jets to remove coke deposits.
Chemical decoking involves using solvents or acids to dissolve coke deposits.
Regular decoking is essential to prevent blockages and maintain fur
Refrigeration cycles are thermodynamic processes used in refrigerators and air conditioners to transfer heat from a low temperature reservoir to a high temperature reservoir.
Refrigeration cycles typically involve four main components: compressor, condenser, expansion valve, and evaporator.
The refrigerant undergoes a cycle of compression, condensation, expansion, and evaporation to absorb heat from the space being coole...
Safety procedures before starting a hot job include obtaining a hot work permit, conducting a hazard assessment, ensuring proper ventilation, and having fire extinguishing equipment nearby.
Obtain a hot work permit before starting any hot job
Conduct a hazard assessment to identify potential risks
Ensure proper ventilation in the work area to prevent buildup of flammable gases
Have fire extinguishing equipment nearby and r
posted on 25 May 2023
I applied via Approached by Company and was interviewed in Apr 2023. There were 2 interview rounds.
Yes, I am comfortable with office work as it aligns with my career goals and I have experience in it.
I have completed internships in office settings and have experience with tasks such as data entry and report writing.
I understand the importance of office work in achieving organizational goals and am willing to contribute my skills to the team.
I am also open to learning new software and tools that may be required for t
Developed a web-based inventory management system for a retail store.
Used PHP and MySQL for backend development.
Implemented a user-friendly interface using HTML, CSS, and JavaScript.
Incorporated barcode scanning functionality for efficient inventory tracking.
Conducted thorough testing and debugging to ensure system reliability.
Received positive feedback from the client and increased their sales by 20%.
HPCL produces petroleum products for various industries and consumers.
HPCL produces a range of petroleum products including petrol, diesel, LPG, aviation fuel, lubricants, and bitumen.
These products are used by various industries such as transportation, aviation, power, and manufacturing, as well as by individual consumers.
HPCL also produces specialty products such as jute batching oil, transformer oil, and marine fuel...
posted on 16 Sep 2023
I applied via Company Website and was interviewed before Aug 2021. There were 4 interview rounds.
General aptitude regarding mathematics, time work, time and distance, blood relations.
based on 3 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
114
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Officer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Associate
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Account Assistant
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Container Corporation of India
Shipping Corporation of India
Oil India
Indian Oil Corporation