Filter interviews by
I applied via LinkedIn and was interviewed before Mar 2022. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Nov 2019. There were 4 interview rounds.
I applied via LinkedIn and was interviewed in Jun 2021. There were 3 interview rounds.
Steam ejector charging procedure involves purging the system with steam to remove air and non-condensable gases.
Ensure steam ejector is isolated from the system before starting the charging procedure
Open the steam supply valve to the ejector to allow steam to flow through the system
Monitor pressure and temperature gauges to ensure proper charging
Close the steam supply valve once the charging is complete
Check for any le...
Major causes for drum level going low include leaks in the feedwater system, malfunctioning level control valves, and sudden load changes.
Leaks in the feedwater system can lead to a decrease in drum level.
Malfunctioning level control valves may not be able to maintain the desired drum level.
Sudden load changes can cause fluctuations in drum level.
Foaming or carryover in the boiler can also result in low drum level.
Turbine rolling procedure involves slowly rotating the turbine to prevent damage during startup.
Turbine rolling is done to ensure even heating of components and prevent thermal stress.
It is important to follow manufacturer's guidelines for speed and duration of rolling.
Rolling should be done in both directions to prevent uneven wear on bearings.
Monitoring vibration levels during rolling is crucial to detect any abnorma...
Bajaj Energy interview questions for popular designations
I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via AmbitionBox and was interviewed before May 2021. There were 2 interview rounds.
CHP coal circuit running hour high
I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.
To startup a plant safely, follow proper procedures, conduct safety checks, and ensure all equipment is functioning correctly.
Follow startup procedures outlined in the plant's operating manual
Conduct safety checks to ensure all systems are functioning properly
Ensure all equipment is properly calibrated and functioning correctly
Train all personnel on safety procedures and emergency protocols
Have a contingency plan in pl...
I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed before Jan 2021. There were 4 interview rounds.
Manager related
I expect you to provide guidance, support, and opportunities for growth in my role as a Senior Engineer.
Clear communication on expectations and goals
Regular feedback and support for professional development
Opportunities for learning new technologies and skills
Collaborative work environment
Recognition for achievements and contributions
based on 2 interviews
Interview experience
based on 223 reviews
Rating in categories
Assistant Manager
46
salaries
| ₹5.5 L/yr - ₹12 L/yr |
Manager
45
salaries
| ₹10 L/yr - ₹18.9 L/yr |
Deputy Manager
45
salaries
| ₹7.3 L/yr - ₹13.9 L/yr |
Senior Engineer
37
salaries
| ₹4.5 L/yr - ₹10.1 L/yr |
Engineer
29
salaries
| ₹3.5 L/yr - ₹6.6 L/yr |
Suzlon Group
Adani Power
Adani Group
Eaton