Upload Button Icon Add office photos

Avaada Energy

Compare button icon Compare button icon Compare
4.4

based on 250 Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Avaada Energy Deputy Manager Interview Questions, Process, and Tips

Updated 20 Aug 2024

Top Avaada Energy Deputy Manager Interview Questions and Answers

Avaada Energy Deputy Manager Interview Experiences

2 interviews found

Deputy Manager Interview Questions & Answers

user image Mahendra parashar

posted on 20 Aug 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is solar cells and module
  • Ans. 

    Solar cells are devices that convert sunlight into electricity, while solar modules are made up of multiple solar cells connected together.

    • Solar cells are typically made of silicon and other materials that can generate electricity when exposed to sunlight

    • Solar modules, also known as solar panels, are made up of multiple solar cells connected together to increase the amount of electricity generated

    • Solar cells and module...

  • Answered by AI
  • Q2. What are specification of solar module RM
  • Ans. 

    Solar module RM specifications include size, efficiency, material, and warranty.

    • Size: Typically ranges from 60 to 72 cells for residential use.

    • Efficiency: Higher efficiency modules can convert more sunlight into electricity.

    • Material: Most common materials include monocrystalline silicon, polycrystalline silicon, and thin-film.

    • Warranty: Usually comes with a warranty ranging from 20 to 25 years.

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Eva and Poe difference and costing
  • Ans. 

    Eva and Poe are two different costing methods used in accounting.

    • Eva costing is based on the assumption that all costs are variable, while Poe costing separates costs into fixed and variable components.

    • Eva costing is simpler and easier to implement, while Poe costing provides a more accurate representation of costs.

    • Example: Eva costing would allocate the entire cost of a production run to the units produced, while Poe ...

  • Answered by AI
  • Q2. Reliability testing procedure as per iec for solar modules
  • Ans. 

    Reliability testing procedures for solar modules according to IEC standards involve various tests to ensure durability and performance.

    • IEC 61215 and IEC 61646 are the standards for reliability testing of crystalline silicon and thin-film solar modules, respectively.

    • Tests include thermal cycling, damp heat, humidity freeze, mechanical load, and UV exposure.

    • These tests simulate harsh environmental conditions to assess th...

  • Answered by AI

Deputy Manager Interview Questions & Answers

user image Ajay Singh Devade

posted on 16 May 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Electrical comodity questions like cable, transformer, panel routine test & type test questions.
  • Q2. Previous organizations experience questions.
  • Q3. Solar site related questions like installation of equipments
  • Q4. HR round 1. why you want to join our organization. 2.Why have you left the previous organizations.

Interview Preparation Tips

Interview preparation tips for other job seekers - 4 round interview

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sale our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you will check to sanction a loan t ... read more
Q4. What we do for shortage of material received?
Q5. What was your major master areas?

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About work area
  • Q2. About boiler process
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Working field related technical questions
Round 3 - HR 

(1 Question)

  • Q1. Expected salary, notice period, previous experience,
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Regarding past experiences
Round 3 - Technical 

(1 Question)

  • Q1. Related to previous experiences

Interview Preparation Tips

Interview preparation tips for other job seekers - Be original be calm, they wants a loyal and sincere team mate. So don't brag about your capabilities or experience unnecessarily.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. What is the cause of damaging MHV in first 3 hoppers.
  • Ans. 

    The cause of damaging MHV in first 3 hoppers is likely due to improper maintenance and lack of regular inspections.

    • Lack of regular maintenance checks on the MHV in the first 3 hoppers

    • Possible wear and tear on the MHV components leading to damage

    • Inadequate training of staff on proper handling and operation of the MHV

    • Potential issues with the design or installation of the MHV system

  • Answered by AI
  • Q2. What is the purpose of gland packing in pumps.
  • Ans. 

    Gland packing in pumps is used to prevent leakage of fluid along the pump shaft.

    • Gland packing is a material placed around the pump shaft to create a seal between the shaft and the pump housing.

    • It helps prevent leakage of fluid from the pump, ensuring efficient operation.

    • Gland packing needs to be regularly checked and replaced to maintain its effectiveness.

    • Common materials used for gland packing include graphite, PTFE, ...

  • Answered by AI
  • Q3. What is the shutoff vacuum?.
  • Ans. 

    Shutoff vacuum is the point at which a vacuum pump stops working due to reaching its maximum pressure limit.

    • Shutoff vacuum is the maximum pressure limit at which a vacuum pump ceases to operate.

    • It is important to know the shutoff vacuum to prevent damage to the pump.

    • Regular maintenance and monitoring of the shutoff vacuum is necessary to ensure proper functioning of the vacuum pump.

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Can you want to join our firm and related to salary negotiation.

Interview Preparation Tips

Interview preparation tips for other job seekers - DB Power ltd.is good for any job seekers. Any body can work here

I applied via Naukri.com

Interview Questionnaire 

4 Questions

  • Q1. Say about yourself
  • Q2. Explain Billing process
  • Ans. 

    Billing process involves generating invoices and collecting payments for goods or services provided.

    • Creating invoices based on the goods or services provided

    • Sending invoices to customers

    • Tracking payments received and outstanding balances

    • Following up with customers on overdue payments

    • Recording payments in accounting software

    • Generating financial reports on billing activity

  • Answered by AI
  • Q3. Explain suppliers bill certification process
  • Ans. 

    Suppliers bill certification process involves verifying and approving invoices from suppliers.

    • The supplier sends an invoice for goods or services provided

    • The invoice is checked for accuracy and completeness

    • The invoice is matched with the purchase order and delivery receipt

    • The invoice is approved for payment if all information is correct

    • The payment is made to the supplier

  • Answered by AI
  • Q4. Explain BBU, MDCC.
  • Ans. 

    BBU stands for Baseband Unit and MDCC stands for Multi-Domain Command and Control.

    • BBU is a key component in a cellular network that processes and transmits data between the user's device and the core network.

    • MDCC is a system used by the military to coordinate and control operations across multiple domains, such as land, sea, air, and space.

    • BBU and MDCC are two different concepts used in different fields, but both are i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer freely & to the point answer.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Aptitude Test 

Open competitive exam was conducted in All India basis and short listed candidates were called for another round of recruitment.

Round 2 - Group Discussion 

GD was conducted after test. Topic was related with organisation business area.

Round 3 - One-on-one 

(2 Questions)

  • Q1. Final round of interview was conducted for shortlisted candidates of GD. I was asked about the questions related with my work experience
  • Q2. Describe the current energy efficiency market scenario of the country
  • Ans. 

    The energy efficiency market in the country is growing rapidly.

    • The government has launched various initiatives to promote energy efficiency such as the National Mission for Enhanced Energy Efficiency (NMEEE).

    • The market is driven by the increasing demand for energy-efficient products and services due to rising energy costs and environmental concerns.

    • The adoption of energy-efficient technologies such as LED lighting, sma...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you’re looking for full time government job in the energy sector, you can apply once the organisation publishes the vacancy.

I applied via Newspaper Ad and was interviewed before Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

Discussion on prominent business or geopolitical issue among 10-12 participants.

Round 3 - One-on-one 

(3 Questions)

  • Q1. Major updates under Ind AS
  • Ans. 

    Ind AS updates include changes in revenue recognition, lease accounting, and financial instruments.

    • Ind AS 115 introduced a new revenue recognition model

    • Ind AS 116 changed the accounting for leases

    • Ind AS 109 introduced new rules for financial instruments

    • Ind AS 32 and 107 were revised to align with the new financial instruments standard

    • Ind AS 103 was revised to align with the new business combinations standard

  • Answered by AI
  • Q2. Methods and technicalities in preparing Cash Flow Statement.
  • Ans. 

    Cash Flow Statement preparation involves analyzing cash inflows and outflows.

    • Identify cash inflows and outflows from operating, investing, and financing activities

    • Calculate net cash flow by subtracting cash outflows from cash inflows

    • Prepare a statement of cash flows using the direct or indirect method

    • Ensure accuracy by reconciling beginning and ending cash balances

  • Answered by AI
  • Q3. Recent Developments in Direct pr Indirect taxation.
  • Ans. 

    Recent developments in direct and indirect taxation include changes in GST rates, introduction of e-invoicing, and new tax slabs.

    • GST rates have been revised for various goods and services, such as reduction in rates for hotel room tariffs and outdoor catering services.

    • E-invoicing has been introduced for businesses with a turnover of over Rs. 500 crore to improve tax compliance and reduce errors.

    • New tax slabs have been ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be updated of technical updates. Be confident and clear about your experience.

I applied via Approached by Company and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Why you would like to switch?
  • Ans. Career Growth and better career-life balance
  • Answered by Abhishek Ranjan
  • Q2. Would you like to relocate?
Round 3 - Technical 

(2 Questions)

  • Q1. What are the basic IEC standards in PV module design & type qualification; and safety qualification?
  • Ans. 

    The basic IEC standards in PV module design & type qualification are IEC 61215 and IEC 61730 for design qualification, and IEC 61215 and IEC 61730 for type qualification. The safety qualification standard is IEC 61730.

    • IEC 61215 is the standard for crystalline silicon terrestrial photovoltaic (PV) modules

    • IEC 61730 is the standard for safety qualification of PV modules

    • Design qualification ensures the module design meets ...

  • Answered by AI
  • Q2. Solar Backsheet layers regarding..
  • Ans. 

    Solar backsheet layers provide protection and insulation for solar panels.

    • Solar backsheet layers are typically made of a combination of materials such as polyester, fluoropolymer, and ethylene-vinyl acetate (EVA).

    • The backsheet layers act as a barrier against moisture, UV radiation, and other environmental factors that can degrade the solar cells.

    • They also provide electrical insulation to prevent short circuits and ensu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be original. Experience speaks...

Avaada Energy Interview FAQs

How many rounds are there in Avaada Energy Deputy Manager interview?
Avaada Energy interview process usually has 2 rounds. The most common rounds in the Avaada Energy interview process are Technical, Resume Shortlist and One-on-one Round.
How to prepare for Avaada Energy Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Avaada Energy. The most common topics and skills that interviewers at Avaada Energy expect are Typing Speed, Soft Skills, Advocacy, Operations and SAP.
What are the top questions asked in Avaada Energy Deputy Manager interview?

Some of the top questions asked at the Avaada Energy Deputy Manager interview -

  1. What are specification of solar module...read more
  2. Reliability testing procedure as per iec for solar modu...read more
  3. What is solar cells and mod...read more

Tell us how to improve this page.

People are getting interviews through

based on 2 Avaada Energy interviews
Job Portal
50%
50% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates
Avaada Energy Deputy Manager Salary
based on 102 salaries
₹7.3 L/yr - ₹15.2 L/yr
22% more than the average Deputy Manager Salary in India
View more details

Avaada Energy Deputy Manager Reviews and Ratings

based on 23 reviews

4.0/5

Rating in categories

3.6

Skill development

4.0

Work-Life balance

3.8

Salary & Benefits

4.4

Job Security

3.9

Company culture

4.1

Promotions/Appraisal

3.8

Work Satisfaction

Explore 23 Reviews and Ratings
Assistant Manager
178 salaries
unlock blur

₹4.4 L/yr - ₹12.5 L/yr

Deputy Manager
102 salaries
unlock blur

₹7.3 L/yr - ₹15.2 L/yr

Senior Manager
63 salaries
unlock blur

₹12 L/yr - ₹31.2 L/yr

Manager
56 salaries
unlock blur

₹8.4 L/yr - ₹20.9 L/yr

Electrical Engineer
54 salaries
unlock blur

₹2.8 L/yr - ₹6.2 L/yr

Explore more salaries
Compare Avaada Energy with

Adani Green Energy

4.1
Compare

ReNew

4.2
Compare

Azure Power

3.9
Compare

Hero Future Energies

4.4
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview