Filter interviews by
I applied via Naukri.com and was interviewed before Mar 2022.Ā There were 3 interview rounds.
My daily work flow involves analyzing costs, creating budgets, and collaborating with other departments.
Reviewing and analyzing financial data
Creating and managing budgets
Collaborating with other departments to ensure cost efficiency
Preparing reports and presentations for management
Attending meetings and providing financial insights
Staying up-to-date with industry trends and regulations
Various types of materials are used in costing with different rates.
Materials can be categorized as direct and indirect
Direct materials include raw materials, components, and sub-assemblies
Indirect materials include consumables, office supplies, and maintenance supplies
Current rates depend on market conditions and availability
Example: Steel - $800/ton, Copper - $6.50/lb, Plastic - $0.50/lb
Unit and bulk quantity costing have different impacts on the overall cost of production.
Unit quantity costing involves determining the cost of producing one unit of a product, while bulk quantity costing involves determining the cost of producing a large quantity of the same product.
Unit quantity costing is useful for determining the cost of producing small quantities of a product, while bulk quantity costing is useful...
Explain the estimation sheet in brief.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Mar 2021.Ā There were 3 interview rounds.
A framework is a set of guidelines, standards, and tools used to develop software applications.
A framework provides a structure for developers to build upon
It includes pre-written code and libraries to simplify development
Frameworks can be specific to a programming language or platform
Examples include React for web development and TensorFlow for machine learning
posted on 19 Nov 2020
I applied via Campus Placement and was interviewed in Jan 2021.Ā There were 3 interview rounds.
Swap two numbers with and without temporary variable
Without temporary variable: Use addition and subtraction
With temporary variable: Use a third variable to store the value of one of the numbers
Example without temporary variable: a=5, b=7; a=a+b; b=a-b; a=a-b;
Example with temporary variable: a=5, b=7; temp=a; a=b; b=temp;
I applied via Naukri.com and was interviewed in Jan 2020.Ā There were 3 interview rounds.
Depreciation is necessary to allocate the cost of an asset over its useful life.
Depreciation helps in matching the cost of an asset with the revenue it generates.
It allows for the recognition of the wear and tear, obsolescence, and loss of value of assets over time.
Depreciation expense reduces taxable income, resulting in tax savings for companies.
It helps in determining the true profitability and financial position of...
I applied via Naukri.com and was interviewed in Oct 2020.Ā There was 1 interview round.
Second level cache is a caching mechanism used to improve performance by storing frequently accessed data in memory.
Second level cache is implemented at the application level and can be configured using frameworks like Hibernate.
To optimize SQL queries, one can use indexes, avoid using SELECT *, and use JOINs instead of subqueries.
SOLID principles are a set of design principles for writing maintainable and scalable cod...
To deploy an application in AWS, you need to create an EC2 instance, configure security groups, install necessary software, and upload your application code.
Create an EC2 instance in the desired region and select the appropriate instance type
Configure security groups to allow traffic to and from the instance
Install necessary software and dependencies on the instance
Upload your application code to the instance
Start the ...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
TCS
Accenture
Wipro
Cognizant