I applied via Company Website and was interviewed before Jul 2022. There were 3 interview rounds.
Engine oil pressure in a healthy engine is typically around 25-65 psi. The process of a 4-stroke engine involves intake, compression, power, and exhaust strokes.
Engine oil pressure in a healthy engine is usually between 25-65 psi
The process of a 4-stroke engine includes intake, compression, power, and exhaust strokes
Intake stroke: Fuel and air are drawn into the combustion chamber
Compression stroke: The fuel-air mixtur...
Top trending discussions
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 21 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
It was basic level coding question. you can answer if you strong in basic level of java
I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.
Face interview when it will be there??
I appeared for an interview before Mar 2024, where I was asked the following questions.
The cable laying process involves planning, trenching, installation, and testing for effective electrical distribution.
Planning: Assess the route and determine cable type based on load requirements.
Trenching: Excavate the ground to lay cables, ensuring proper depth and width.
Installation: Place cables in trenches, using protective conduits if necessary.
Backfilling: Cover the cables with soil, ensuring no sharp objects ...
posted on 23 Jul 2024
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
posted on 9 Oct 2021
I applied via Campus Placement and was interviewed before Oct 2020. There was 1 interview round.
posted on 7 Dec 2021
I applied via Campus Placement and was interviewed before Dec 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Quality Engineer
125
salaries
| ₹1.8 L/yr - ₹6.6 L/yr |
Design Engineer
18
salaries
| ₹2.4 L/yr - ₹4.3 L/yr |
Engineer
14
salaries
| ₹2.1 L/yr - ₹3.8 L/yr |
Supplier Quality Engineer
13
salaries
| ₹2.2 L/yr - ₹3 L/yr |
Supplier Quality Assurance Engineer
11
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group